
step 3
Prepare the hinges for the application, using one small drop of sinthetic oil in their center of
movement.
step 4
Use good quality 5 minutes epoxy to glue the hinges in the elevator, and remember to check the
correct sense of work for every hinge. If necessary clean the zone of the hinges with paper towels
and rubbing alcohol.
step 5
Always with 5 minutes epoxy glue the hinges in the stabilizer. If necessary clean the zone of the
hinges with paper towels and rubbing alcohol.
20
Содержание Wind S 110 ARF
Страница 2: ......