-19-
A. TEST PROCEDURES
11. TEST AND CHECKOUT PROCEDURES, AND TROUBLESHOOTING
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE OUTER CASE
FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH VOLTAGE CAPACITOR
AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE HIGH VOLTAGE
TRANSFORMER.
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER OF
WATER IN CONTAINER) IN THE OVEN.
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
1. Measure the resistance.
(Select the ohm scale on the meter)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Select the ohm scale on the meter)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Select the ohm scale on the meter)
• Filament terminal
2. Measure the resistance.
(Select the ohm scale on the meter)
• Filament to chassis
Normal: Less than 1 ohm
Normal: Infinite
COMPONENTS
TEST PROCEDURE
RESULTS
FILAMENT
WINDING
PRIMARY
TERMINAL
SECONDARY
WINDING
Approx.: 0.7 ~ 0.9 ohm
Approx.: 90 ~ 120 ohm
Less than: 1 ohm
Normal: Infinite
Normal: Infinite
Содержание 721.66292500
Страница 9: ...6 OVERALL CIRCUIT DIAGRAM A SCHEMATIC DIAGRAM 8...
Страница 10: ...9 B MATRIX CIRCUIT FOR TOUCH KEY BOARD...
Страница 36: ...35 LATCH BOARD PARTS W102 5015 5006 4002 4003 4002 4004 4000 EV...
Страница 38: ...37 BASE PLATE PARTS 6000 6012 W108 6002 W109 W108 W101 6001 5008 EV...
Страница 40: ...P NO 3828W5S5272 Printed in Korea...