
OPTIONAL PROCEDURE 3.6
– THREE TOGGLE SWITCHES
SeaPerch ROV Construction Manual
– Version 2010-04NW
3.6-2
4.
Ask the teacher or an adult volunteer to check the wiring, and then screw the
cover onto the control box using the Phillips screwdriver and the screws provided.
5.
Place the fuse in the fuse holder, if it is not already in place, but
do not connect
the battery
until the testing in the following section has been completed
.
A completed ROV system is shown in Figure 3.6-3.
CONGRATULATIONS
, you have finished the construction of your SeaPerch ROV!
Now it’s time to get it ballasted and tested!
Figure 3.6-3:
Completed SeaPerch ROV System, Ready for Testing and Ballasting
Procedure 3.6 – Continued
Содержание Remotely Operated Vehicle
Страница 2: ......
Страница 6: ......
Страница 18: ......
Страница 20: ......
Страница 22: ......
Страница 24: ......
Страница 26: ......
Страница 28: ......
Страница 32: ......
Страница 34: ......
Страница 38: ......
Страница 40: ......
Страница 42: ......
Страница 44: ......
Страница 50: ......
Страница 54: ......
Страница 58: ......
Страница 64: ......
Страница 72: ......
Страница 76: ......
Страница 84: ......
Страница 90: ......
Страница 96: ......
Страница 104: ......
Страница 108: ......