![SealMaster CRACK PRO 125 Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/sealmaster/crack-pro-125/crack-pro-125_owners-manual_1227839032.webp)
32
CRACK PRO® HEATED HOSE MACHINE
OPERATING INSTRUCTIONS - DIESEL FUEL BURNER
THE TEMPERATURE CONTROL
After starting the engine:
1.
Turn
on
the burner with power on-off switch located on the front
of the digital temperature controller. The digital controllers
monitor the heat transfer oil temperature, and the material
temperature, along with the heated hose.
2.
Turn
on
the a/c power switch. The controller will cycle the burner
off and on as the temperature of the heat transfer oil increases
and decreases. The heat from the transfer oil will be absorbed by
the material in the tank.
TRANSFER OIL
TEMP. SET
BURNER CONTROL
SWITCH
HEATED HOSE
TEMP. SET
A/C POWER
SWITCH
MATERIAL
TEMP. SET
Содержание CRACK PRO 125
Страница 1: ......
Страница 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Страница 22: ...22 ...
Страница 23: ...23 ...
Страница 24: ...24 ...
Страница 25: ...25 ...
Страница 26: ...26 ...
Страница 27: ...27 ...
Страница 28: ...28 ...
Страница 29: ...29 ...
Страница 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Страница 58: ...58 CRACK PRO HEATED HOSE MACHINE APPLIES TO ALL DIESEL FUEL BURNERS PARTS LIST PICTURE DIESEL BURNER 28 29 25 ...
Страница 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Страница 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...