Latest products and information available at www.sealite.com
7
TRIDENT-3000-HEX with hexagonal aluminium tower
3000mm dia. Ocean Buoy
STEP 3
If an external moon pool is to be fitted then locate the moon pool mount between two of the float
sections as shown. Align the moon pool mount and float section junction with any one of the mooring
post lifting eyes. It is recommended for ease of wiring that the mount be aligned with one of the lifting
eye beams which also carries one of the hex tower mounting points (see top view). The lifting eye
should be trapped by the channel at the inner most end of the moon pool mount (this prevents the
mooring post from spinning in the float during service).
Place a flat washer on the bolt before sliding it through the hole in the
Float Section, then fit a second flat washer and a Spring washer on to
the bolt before securing with a nut.
Hand tighten 2 – 4 bolts (M16 x 80) per side until all four Float
sections are secured around the mooring post.
When a moon pool
is to be fitted, 8 longer connecting bolts (M16 x 90) and 9 packing
washers are supplied for incorporation with the float assembly as
shown.
Secure 8 x bolts down each joint on the Float Sections.
Leave the Mooring post and Float to settle for 4 hours or overnight
before tightening each bolt a second time.
Giving the buoy time to
relax in the fitted position will create a better joint.
Содержание TRIDENT-3000-HEX
Страница 2: ...Technical Specifications ...