background image

5.1.

  Ensure that the jack pneumatic switch is in the "off" position  

 

before connecting to the air supply. 

5.2.

  You will require an air pressure of at least 116psi (max 145psi  

 

or 174psi for YAJ20-40LR) and an air flow of 10.5cfm or  

 

11.5cfm for YAJ20-40LR to get the best performance from this  

 

jack. 

5.3.

 

 

WaRnInG! 

Ensure the air supply does not exceed 145psi  

 

or 174psi for YAJ20-40LR while operating the jack.  

 

Too high an air pressure and unclean air will shorten the  

 

products life due to excessive wear, and may be dangerous  

 

causing possible damage and personal injury.

5.4.

  Drain the air tank daily. Water in the air line will damage the  

 

jack.

5.5.

  Clean the air inlet filter screen weekly. 

5.6.

  Keep the air hose between the compressor and the air jack as  

 

short as possible, and install an air filter and oiler (fig.2).

5.7.

  Line pressure should be increased to compensate for   

 

unusually long air hoses (over 8 metres). The minimum hose  

 

diameter should be 3/8" I.D. and fittings must have the same  

 

inside dimensions.

5.8.

  Keep hose away from heat, oil and sharp edges. Check hoses  

 

for wear, and make certain that all connections are secure.

  5.  aIR SuPPLy

Original Language Version

YAJ15-30, YAJ15-30DC, YAJ20-40, 

 YAJ20-40DC, YAJ20-40LR      

Issue  2 - 13/03/12

6.1. 

Preparation - yaJ15-30, yaJ20-40, yaJ20-40LR

  

6.1.1.  You will require an air pressure of at least 116psi (max  

 

145psi or 174psi for YAJ20-40LR) and an air flow of  10.5cfm  

 

or 11.5cfm for YAJ20-40LR to get the best performance from  

 

the jack.

6.1.2.  Connect the air supply to the connector (fig.3B).

6.1.3.  Set the handle to the required angle using the handle release  

 

lever shown in fig.3A. Pull the lever upwards towards the  

 

main handle. Move the handle to the required position and  

 

release the lever to lock it into position.

6.2. 

Preparation - yaJ15-30DC, yaJ20-40DC 

 

6.2.1.  Connect the air supply to the connector (fig.4A).

6.2.2  To change the handle position on the "DC" models turn the  

 

handle (fig.4D) anti-clockwise then pull out of socket, insert  

 

into the other handle socket and turn clockwise to secure.

6.2.3  On the "DC" models the controls (fig.4B) are detachable, lift  

 

and slide off the handle before putting the jack under the  

 

vehicle. 

fig.2

  6.  OPERaTIOn

fig.1

6.3. 

Purge the System - yaJ15-30, yaJ20-40, yaJ20-40LR

 

Before using the jack, purge the hydraulic circuit in order to  

 

eliminate any possible air that may have entered the system  

 

during transit.

6.3.1.  Push the control lever (fig.5A) to the ‘down’ position  and hold  

 

it there for several seconds. Release the lever to the centre  

 

‘hold’ position. 

6.3.2.  Now push the lever to the ‘up’ position and hold it there until  

 

the jack is fully extended. Push the lever to the ‘down’  

 

position and watch the jack as it retracts. The lowering  

 

movement should be smooth and without irregular stops.

6.3.3.   Repeat the raising and lowering cycle until the movement is  

  smooth. Once this has been achieved this indicates that all  

  air has been expelled.

6.4. 

Purge the System - yaJ15-30DC, yaJ20-40DC

 

Before using the jack, purge the hydraulic circuit in order to  

 

eliminate any possible air that may have entered the system  

 

during transit.

6.4.1.  Push the down button (fig.6B)  and hold it there for several  

 

seconds. Release the button. 

6.4.2.  Now push the 'up' button and hold it there until the jack is  

 

fully extended. Push the 'down' button and watch the jack as  

 

it retracts. The lowering movement should be smooth and  

 

without irregular stops.

6.4.3.   Repeat the raising and lowering cycle until the movement is  

  smooth. Once this has been achieved this indicates that all  

  air has been expelled.

6.5. 

using the Jack - yaJ15-30, yaJ20-40, yaJ20-40LR

 

 WaRnInG! 

ensure you have read and understood the  

 

safety instructions in chapter 1 before commencing work.

6.5.1.  Position the Jack under the vehicle manufacturer’s    

 

recommended jacking point 

(see vehicle hand book).

Note:   Use the extension pins (fig.3D) to get the jack closer  

 

to the jacking point before engaging the jack. See    

 

specification for capacity when using the extension pins. 

6.5.2.  Whilst holding the main jack handle lifting is achieved by  

 

pushing the control lever to the 'up' position (fig.5B).

6.5.3.  When the vehicle has reached the desired height release the  

 

control lever which will automatically return to the middle  

 

hold position stopping any further air flow holding the jack at  

 

the height to which it has been raised.

6.5.4.  Place axle stands correctly in position and ensure chapter 1  

 

safety instructions are strictly applied before performing any  

 

task. 

fig.3

fig.4

Отзывы: