GSS1515.V2, GSS1515G.V2 Issue: 2(I) - 13/04/17
Original Language Version
© Jack Sealey Limited
Garden
Shed
1.5 x 1.5 x 2.1m
5B
W
BACK
U12
U12
Step 6:
Assemble the front door (continued)
Once channels are fitted to both doors, align 2 x part U12 (brace) and part W (joining brace) with holes on the back of the door and
position temporarily with some tape or simply hold in place.
Turn door over so the
ridges are facing down.