![SEAL 62Pro Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/seal/62pro/62pro_user-manual_1223557021.webp)
Installation
19
E
n
g
lis
h
4.2 Installation
1. Move the machine (and the accessories) to its final location.
Note:
Allow ample working space. See Figure 8.
Figure 8: Working space.
L = Maximum board length, S = Minimum space 60 cm.
2. Turn down the four leveling feet until the castors are off the floor.
3. Remove all transport material.
•
Cut the straps around the shaft suspensions and remove the foam pads.
•
Cut the straps holding the in-feed table arms
•
Cut the straps around the main roller axis and move up the top main roller to
remove the transport blocks from the nip.
•
Cut the straps holding the upper pull roller and open the pull rollers to remove the
transport plates.
4. Put a spirit level on the upper main roller and level the machine by adjusting the four
leveling feet.
CAUTION:
Check the mains values before connecting. See section 3.4 for power supply
details
5. Connect the machine to the mains using the power cable supplied with the machine.
CAUTION:
Only if absolutely necessary, use an extension cable of ample capacity.
Unroll the extension cable completely.
WARNING:
MAKE SURE THE POWER SUPPLY CABLE AND/OR THE EXTENSION
CABLE IS NOT BLOCKING YOUR WAY AROUND THE MACHINE.
Содержание 62Pro
Страница 4: ...2 User Manual 62Pro...
Страница 49: ...2 Manuel d utilisation 62Pro...
Страница 95: ...2 Betriebsanleitung 62Pro...
Страница 138: ...English Fran ais Deutsch Espa ol Italianol 62Pro Montadora laminadora y encapsuladora Manual de uso 977 0061_SP_B...
Страница 139: ...2 Manual de uso 62Pro...
Страница 182: ...English Fran ais Deutsch Espa ol Italianol 62Pro Incollatrice laminatrice e incapsulatrice Manuale d uso 977 0061_IT_B...
Страница 183: ...2 Manuale d uso 62Pro...