RANS S-20 RAVEN 20cc
Instruction Manual.
20
5) Attach the speed control to the side
of the motor box using two-sided tape
and tie wraps. Connect the appropriate
leads from the speed control to the mo-
tor. Make sure the leads will not interfere
with the operation of the motor.
Speed control.
Battery.
Open the air exit hole.
M3x15mm
INSTALLING THE SPINNER.
Install the spinner backplate, propeller
and spinner cone.
The propeller should not touch any
part of the spinner cone. If it does, use a
sharp modeling knife and carefully trim
away the spinner cone where the propel-
ler comes in contact with it.
Содержание RANS S-20 RAVEN-20cc
Страница 3: ...3 1 2 3 4 5 6 3 2 ...
Страница 11: ...11 Switch INSTALLING THE MAIN LANDING GEAR TO FUSELAGE M4x20mm Thread locker glue M4x20mm ...
Страница 12: ...RANS S 20 RAVEN 20cc Instruction Manual 12 Collar ...
Страница 27: ...27 M3x20mm ...
Страница 29: ...29 BOTTOM VIEW 3x10mm Thread locker glue ...
Страница 31: ...31 ...
Страница 34: ...RANS S 20 RAVEN 20cc Instruction Manual 34 2 3 120mm 139mm 2 1 1 2 M3x10mm M3x10mm M3 locknut 3 M3 locknut ...
Страница 36: ...RANS S 20 RAVEN 20cc Instruction Manual 36 155mm 52mm ...