ZERO.
Instruction Manual.
26
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
3) Slide the v ertical stabilizer back in
place. Using a triangle, check to ensure that
the vertical stabilizer is aligned 90º to the hori-
zontal stabilizer.
Fill epoxy.
Fill epoxy.
INSTALLING THE VERTICAL STABILIZER.
10) After the epoxy has fully cured, re-
move the masking tape or T-pins used to hold
the stabilizer in place. Carefully inspect the
glue joints. Use more epoxy to fill in any gaps
that may exist that were not filled previously
and clean up the excess using a paper towel
and rubbing alcohol.
Remove covering.
1) Using a modeling knife, remove the
covering from over the precut hinge slot cut
into the lower rear portion of the fuselage.
Fill epoxy.
2) While holding the vertical stabilizer
firmly in place, use a pen and draw a line on
each side of the vertical stabilizer where it
meets the top of the fuselage.
Содержание ZERO MS:123
Страница 15: ...15 www seagullmodels com 3mm 5 2mm 5 2mm Blind nut Epoxy Epoxy...
Страница 29: ...29 www seagullmodels com C A glue Screw...
Страница 31: ...31 www seagullmodels com 8mm Cut RUDDER PUSHROD HORN INSTALLATION 8mm 8mm M2 lock nut M2 clevis Pen C A glue...
Страница 35: ...35 www seagullmodels com Close Position servo arm 12mm Open Position servo arm...