NEMESIS-114
Instruction Manual
16
Set the stabilizer in place and realign. Double
check all of your measurements once more be-
fore the epoxy cures. Hold the stabilizer in place
with T-pins or masking tape and remove any
excess epoxy using a paper towel and rubbing
alcohol. Allow the epoxy to fully cure before
proceeding.
6) When you are sure that everything is
aligned correctly, mix up a generous amount of
30 Minute Epoxy. Apply a thin layer to the mount-
ing slot in the top of the fuselage and to the sides
and bottom of the vertical stabilizer mounting
area. Apply epoxy to the bottom and top edges
of the filler block and to the lower hinge also.
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
5) Slide the vertical stabilizer back in
place. Using a triangle, check to ensure that
the vertical stabilizer is aligned 90º to the hori-
zontal stabilizer.
When cutting through the covering to re-
move it, cut with only enough pressure to
only cut through the covering itself. Cutting
into the balsa structure may weaken it.
4) Remove the stabilizer. Using a mod-
eling knife, remove the covering from below
the lines you drew.
A.
C/A glue.
A.
2) Elevator and rudder pushrods assembly
follow pictures below.
1) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the horns
on until they are flush with the ends of the con-
trol rods.
ELEVATOR - RUDDER PUSHROD
INSTALLATION.
Elevator
control horn.
Rudder
control horn.
Control horn.
Rudder pushrod.
control horn.
Metal clevis.
M3 lock nut.
Elevator pushrod.