![Sea Tel ST24 Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/sea-tel/st24/st24_operation-and-installation-manual_1221319041.webp)
ST24 Ku-Band TVRO
Operation
5-17
5.5.2.2.
System Test Page
#
Description
Function
1.
System Status
Rolling text indicating the systems current status of:
Initializing, Searching, Targeting, Identifying, Tracking, or Unwrapping.
2.
Time Stamp
Current time stamp, based on the antennas on –board GPS.
3.
AGC
System Signal Strength in AGC counts with visual signal bar.
4.
Power On Self Test Results
Click to access the results of the test performed during initialization of
the PCU or GACP.
5.
In Service Test
Click to perform an “In Service System Test” of the PCU or GACP.
6.
Out of Service Test
Click to perform an “Out of Service System Test” of the PCU or GACP.
7.
Home
Click to access the GACP Home Page.
8.
Back
Click to access the previous Page.
9.
Forward
Non-Functional in this screen.
10.
Panel Lock
Press to “Lock” the GACP interface.
Содержание ST24
Страница 6: ...Quick Start ST24 Ku Band TVRO 2 2 THIS PAGE INTENIONALLY LEFT BLANK ...
Страница 8: ...Installation ST24 Ku Band TVRO 3 2 Figure 2 ST24 US DLA AUSSAT Simplified Block Diagram ...
Страница 18: ...Installation ST24 Ku Band TVRO 3 12 THIS PAGE INTENIONALLY LEFT BLANK ...
Страница 44: ...Operation ST24 Ku Band TVRO 5 20 THIS PAGE INTENIONALLY LEFT BLANK ...
Страница 62: ...ST Series Technical Specifications ST24 Ku Band TVRO 7 6 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 64: ...Drawings ST24 Ku Band TVRO 8 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ......