![Sea Tel ST24 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/sea-tel/st24/st24_operation-and-installation-manual_1221319016.webp)
Installation
ST24 Ku-Band TVRO
3-10
Locate and disengage the Azimuth Stowage lock.
Refer to the Maintenance section of this manual
for complete procedures to stow and un-stow your
antenna.
Perform range of motion check on antenna.
Verify free range in Azimuth, Elevation and Polarization drive.
3.7.
Graphic Antenna Control Panel
Label, Connect, and Secure the Antenna M&C
Coax (from Above Decks) to the RF In port of
the GACP.
Connect and secure the DC Power Cable
Assembly or the optional DC Power Switch
Cable Assembly onto the “BATT” connector of
the GACP.
Carefully remove GACP front lid to provide access to the four mounting holes.
Use caution as to not damage or pull out the “COM 0” interface harness that interconnects the display
module PCB to the controller PCB.
Содержание ST24
Страница 6: ...Quick Start ST24 Ku Band TVRO 2 2 THIS PAGE INTENIONALLY LEFT BLANK ...
Страница 8: ...Installation ST24 Ku Band TVRO 3 2 Figure 2 ST24 US DLA AUSSAT Simplified Block Diagram ...
Страница 18: ...Installation ST24 Ku Band TVRO 3 12 THIS PAGE INTENIONALLY LEFT BLANK ...
Страница 44: ...Operation ST24 Ku Band TVRO 5 20 THIS PAGE INTENIONALLY LEFT BLANK ...
Страница 62: ...ST Series Technical Specifications ST24 Ku Band TVRO 7 6 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 64: ...Drawings ST24 Ku Band TVRO 8 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ......