6009-33 Broadband At Sea
Maintenance and Troubleshooting
7-6
7.2.4.
To Reset/Reinitialize the Antenna:
Pressing Reset on the ACU front panel does NOT cause a reset of the above decks equipment. To Re-initialize
the antenna from the REMOTE COMMAND window on the ACU:
1.
Using the LEFT/RIGHT and UP/DOWN arrow keys set the Remote Command value to "^0090" and
press ENTER.
This resets the PCU on the antenna. The antenna will reinitialize with this command (Performs a similar
function as a power reset of the antenna).
7.2.5.
Replace Wire Rope Isolators
Use Sea Tel replacement kit 129980
1.
Place the wedge provided in the wire
rope replacement kit in between the
upper and lower base plates near one of
the wire rope isolators.
2.
Using a 6mm wrench, loosen the
bottom bolts at each end of one of the
wire rope isolators near the wedge.
3.
Loosen, remove and discard the top
bolts at each end of the wire rope
isolator.
4.
Remove the wire rope isolator, discard it
and the bottom bolts.
5.
Apply Loctite to 2 of the M6x20 bolts
provided in the kit. Place a lock washer,
and then a flat washer, on each bolt and
place them in the bottom bar of the
replacement wire rope isolator.
6.
Slide the replacement wire rope isolator
into place in between the upper and
lower base plates.
7.
Align and start the bottom bolt in the
threaded hole of the bottom plate.
8.
Apply Loctite to 2 of the M6x25 bolts
provided in the kit. Place a lock washer,
and then a flat washer, on each bolt and
place them into the top bolt holes, move
the upper bar of the wire rope isolator
to align the top bolt with the threaded
hole in top bar of the replacement wire
rope isolator.
9.
Tighten the upper and lower bolts to
torque spec.
10.
Repeat steps 1 through 9 to replace
each of the other 3 wire rope isolators.
PRELIMINARY
Содержание 6009-33
Страница 3: ...PRELIMINARY ...
Страница 4: ...PRELIMINARY ...
Страница 8: ...6009 33 Broadband At Sea Introduction viii This Page Intentionally Left Blank PRELIMINARY ...
Страница 18: ...6009 33 Broadband At Sea Installation 3 6 This Page Intentionally Left Blank PRELIMINARY ...
Страница 28: ...6009 33 Broadband At Sea Functional Testing 5 4 This Page Intentionally Left Blank PRELIMINARY ...
Страница 36: ...6009 33 Broadband At Sea Scheduled Preventive Maintenance 6 8 This Page Intentionally Left Blank PRELIMINARY ...
Страница 58: ...6009 33 Broadband At Sea Maintenance and Troubleshooting 7 22 This Page Intentionally Left Blank PRELIMINARY ...
Страница 66: ...6009 33 Broadband At Sea DRAWINGS 9 2 This Page Intentionally Left Blank PRELIMINARY ...
Страница 68: ...PRELIMINARY ...
Страница 72: ...PRELIMINARY ...
Страница 73: ...PRELIMINARY ...
Страница 75: ...PRELIMINARY ...
Страница 77: ...PRELIMINARY ...
Страница 79: ...PRELIMINARY ...
Страница 81: ...PRELIMINARY ...
Страница 83: ...PRELIMINARY ...
Страница 85: ...PRELIMINARY ...
Страница 87: ...PRELIMINARY ...
Страница 88: ...PRELIMINARY ...
Страница 89: ...PRELIMINARY ...
Страница 91: ...PRELIMINARY ...
Страница 93: ...PRELIMINARY ...
Страница 95: ...PRELIMINARY ...