Section 06 STEERING AND PROPULSION
Subsection 02 (iBR AND VTS)
– Check the 30 A iBR power fuse in FB2 and the
5 A iBR control fuse in FB1 if the gate did not
move using the iBR OVERRIDE function.
– Connect the watercraft to B.U.D.S. to check
for iBR system or CAN bus related fault
codes. Carry out service actions as indicated
in B.U.D.S.
– If a CAN bus communication fault with the iBR
module is indicated, or the iBR module is not
visible in B.U.D.S., carry out a continuity test
of the CAN bus wires between the iBR module
and the CAN bus-bars in FB2. Refer to
CON-
TROLLER AREA NETWORK (CAN)
subsection.
– Try moving the iBR using the iBR UP and iBR
DOWN s on the iBR activation page in B.U.D.S.
– Carry out an
iBR SYSTEM FUNCTIONAL TEST
to check for proper gate and actuator move-
ment.
– Visually inspect system connectors for mois-
ture ingress, corrosion, and proper contact.
– Check for excessive backlash in the gate mech-
anism.
– Remove the locking sleeve (iBR key) and en-
sure it is in good condition. Move the gate up
and down by hand to check for freedom of
movement.
PROCEDURES
iBR LEVER SENSOR (BRLS)
BRLS Test Using B.U.D.S.
NOTE:
The BRLS is composed of a twin hall ef-
fect sensor. A resistance test of the sensor can-
not be carried out.
1. Connect watercraft to the latest B.U.D.S. soft-
ware, refer to
COMMUNICATION TOOLS AND
B.U.D.S. SOFTWARE
.
2. Check for an applicable fault code, refer to
MONITORING SYSTEM AND FAULT CODES
.
3. If a fault is indicated, follow service actions as
indicated in B.U.D.S.
BRLS Voltage Test
Test for BRLS input voltage as well as BRLS signal
voltages as per following steps.
1. Press the START/STOP button.
2. Install the D.E.S.S. key to energize the electrical
system.
NOTE:
DO NOT start engine.
sdd2009-001-019_g
Step 1: Press START/STOP button
Step 2: Install D.E.S.S. key
NOTE:
Electrical power will shut off after approx-
imately 3 minutes. Briefly press the START/STOP
button to reactivate the electrical system when re-
quired.
3. Set the suspension to its maximum height by
double clicking the iS UP button. This will pro-
vide better access to the steering connectors.
sdd2009-001-019_f
Step 1: Suspension to maximum height by pressing and holding
the iS UP
NOTE:
If more height is required or if the iS sys-
tem cannot be used, manually lift the suspension
using a hoist and the anchor points close to han-
dlebars. Then safety lock it in the up position.
NOTICE
Do not lift the watercraft using the
anchor points.
4. Open the front storage compartment cover and
remove the storage bin.
smr2009-037
383
Содержание GTX Limited iS 255 2009
Страница 1: ......
Страница 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Страница 23: ...XX smr2009 011 ...
Страница 27: ...4 ...
Страница 29: ...6 ...
Страница 33: ...10 ...
Страница 37: ...14 ...
Страница 47: ...24 ...
Страница 53: ...30 ...
Страница 59: ...36 ...
Страница 81: ...58 ...
Страница 107: ...84 ...
Страница 171: ...148 ...
Страница 195: ...172 ...
Страница 209: ...186 ...
Страница 235: ...212 ...
Страница 275: ...252 ...
Страница 303: ...280 ...
Страница 319: ...296 ...
Страница 335: ...312 ...
Страница 381: ...358 ...
Страница 395: ...372 ...
Страница 449: ...426 ...
Страница 489: ...466 ...
Страница 551: ......
Страница 552: ...NOTES ...
Страница 553: ...NOTES ...
Страница 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Страница 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...