Notes
1. Position the double glazed unit on the stillage: the unit must
be transported with the head rail at the top; where this is not
possible, lie the unit on its longer side with the blind vertical
and completely raised.
2. During glazing ensure the integrated unit is perfectly verti-
cal in the frame in order to avoid any friction between bottom
rail and glass surface during raising and lowering.
Transport and Storage
For transport and storage procedures please check the recom-
mendations contained in the relevant part of the ScreenLine
®
Technical Catalogue
.
assembly instructions
13
In this way, the electric contacts will be immediately ready to
be connected to the external power supply line.
removal of the silicon tubes
electric connection
G
H
H
H2
H1
SL27M plissé_GB 15-05-2007 9:29 Pagina 13