ScreenLine
®
kit components
On receipt of the goods, check the integrity of the package and
confirm that the components are as detailed on the Purchase
Order. The kit comprises :
•
pleated blind with corner keys assembled to the upper spacer
bar
•
2 No. L-shaped spacer bars (height) for the system SL20M plea-
ted; 2 No. C-shaped spacer bars for the system SL22M pleated
•
1 No. bottom U-shaped spacer bar (width)
•
2 No. plastic corner keys
•
2 No. screws
•
1 Metre dual polarity cable with ring connectors attached
Assembly of the integral blind unit
Spacer bars preparation
Fill the appropriate side-spacer bars with requisite amount of
molecular sieve. It is recommended to insert the corner key into
the bottom of each side spacer bar, fill them with the molecular
sieve and “block” the open end with butyl (or fibres), to avoid any
loss of sieve during further operations. Assemble them with the
bottom spacer bar.
Extrude the butyl primary seal both on the assembled blind/upper
spacer bar and then on the rest of the spacers forming
the frame. During this operation, it is recommended great care
is taken with the integral blind, in order to avoid any dirt or dama-
ge of the fabrics. Assemble all the spacer bars to form the com-
plete spacer frame.
Ensure that the spacer projection (L profi-
le) faces the soft coated glass where applicable. Ensure continuity
of the butyl seal - particularly at the corner keys.
assembly instructions
10
4.
kit composition
spacer bars - glass assembly
SL20 22M plissé_GB 15-05-2007 9:45 Pagina 10