
SolidPix1™ Integrated Type I Fixed-Frame Screen Installation Manual
13
Revision A 2007.02.22
©Screen Research 2006
Projection Screen Material Installation
You can install your integrated fixed screen as you
want using the different dedicated grooves, in the
following steps we will illustrate one of the many
possibilities.
1. The projection side of the SolidPix projection screen
fabric is indicated by a sticker (in one corner of the
fabric). Clip it in a groove, using a Pi-Grip.
2. Position the projection screen material using the
short (2” / 50mm) pieces of Pi-Grip. Tension the fabric
only slightly at this time.
projection screen
fabric / corner
bracket
Please note that the above picture is concerning a ClearPix2
projection screen fabric. This will soon be replaced with pic-
ture for a SolidPix1 projection screen fabric.
Please note,
the way of attaching a SolidPix1 projection
screen fabric is the same way of attaching a ClearPix2
projection screen fabric.