FOR THE INSTALLER: Final Check List
1. Is the ice system installed indoors in a
location where the air and water
temperatures are controlled, and where
they do not exceed the design limitations?
2. Is there an electrical service disconnect
within sight of the installed machine? Has
the voltage been checked, and compared
to nameplate requirements?
3. Have all the plumbing connections been
made and checked for leaks?
4. Has the machine and bin been leveled?
5. Is there a minimum of 6" clearance at the
rear, left, and right of the machine for
proper service access and air circulation?
6. Is the water pressure a minimum of 20
psig?
7. Has the machine been secured to the
bin?
8. Is there a water shut off valve installed
near the machine?
9. Have the shipping blocks been removed
from under the gearmotor, the top of the ice
chute, and from between the gearmotor and
the right side panel?
LEVELED?
POWER
SUPPLY?
PLUMBING?
MACHINE
SECURE TO
BIN?
DRAINS?
NME1250
August 1993
Page 7