Page 25

Page 25

The 9th key is used to supply power to the water
pump for the first 15 seconds of the defrost cycle
-  position OFF - or for the first 30 seconds -
position ON.

The 10th key is used to modify the CUT-OUT
condensing temperature from 70

°

(160

°

F) for

the air cooled versions - ON position - to 60

°

C

(140

°

F) - OFF position - for the water cooled

versions.

H.

WATER SPRAY SYSTEM

Through its nozzles, the water pumped, is sprayed
in each individual cup to be frozen into ice.
It consists of one spray tube wheve are located
several spray nozzles.

I.

WATER PUMP

The water pump operates continually throughout
the freezing cycle and on the first 15 or 30
seconds of the defrost cycle so to such the
remaining water from the sump tank (reach in
mineral salts) and drain it out.
During the freezing cycle the pump primes the
water from the sump to the spray system and
through the spray nozzles sprays it into the inverted
cup molds to be frozen into crystal clear ice cubes.
It is recommended that the pump motor bearings
be checked at least every six months.

J.

WATER INLET SOLENOID VALVE -
3/4 GAS MALE FITTING

The water inlet solenoid valve is activated by the
micro processor of the P.C. BOARD during the
first 5 minutes of water filling phase and as well
during the defrost cycle.
When energized it allows a metered amount of
incoming water to flow overt he evaporator cavity
to assist the hot gas in defrosting the ice cubes.
The water running over the evaporator cavity drops
by gravity, through the dribbler holes of  the platen,
into the sump reservoir where it will be sucked by
the water pump and primed to the spray system.

K.

HOT GAS SOLENOID VALVE

The hot gas solenoid valve consists basically in
two parts: the valve body and the valve coil.

Located on the hot gas line, this valve is energized
through the micro processor of P.C. BOARD
during the defrost cycle and as well during the
water filling phase.
During the defrost cycle the hot gas valve coil is
activated so to attract the hot gas valve piston in
order to give way to the hot gas discharged from
the compressor to flow directly into the evaporator
serpentine to defrost the formed ice cubes.

L.  FAN MOTOR (Air cooled version)

The fan motor is controlled through the P.C.
BOARD and the TRIAC by the condenser tempe-
rature sensor. Normally it operates only during
the freezing cycle to draw cooling air through the
condenser fins.
In the second part of the freezing cycle, the fan
motor can run at intermittance as the condenser
pressure must be kept between two corresponding
head pressure values (16

÷

18 bars- 225

÷

250 psig).

M.

COMPRESSOR

The hermetic compressor is the heart of the
refrigerant system and it is used to circulate and
retrieve the refrigerant throughout the entire system.
It compresses the low pressure refrigerant vapor
causing its temperature to rise and become high
pressure hot vapor which is then released through
the discharge valve.

N.

WATER DRAIN SOLENOID VALVE

The water drain solenoid valve, electrically
connected in parallel to the water inlet and to the
hot gas solenoid valves, is energized for all the
length of the defrost cycle.
By means of the water pump, that remains
energized for 30 seconds at the beginning of the
defrost cycle, it allows the drain out of all remaining
water (rich of minerals deposited during the
previous freezing cycle) from the sump tank.
By doing so it allows to the ice maker to make
every new freezing cycle with new fresh water,
avoiding thereby the accumulation of sediments
and scales, which soon or later will cause the partial
or total clogging of the water system on the unit.

Содержание MXG 327

Страница 1: ...39 02 93960 1 Aut Sel Telefax 39 02 93550500 Direct Line to Service Parts Phone 39 02 93960350 Fax 39 02 93540449 Website www scotsman ice it E Mail scotsman europe scotsman it ISO 9001 Cert n 0080 M...

Страница 2: ...ETE APRES LE TEST CAVALIER TEST FERME MACCHINA NELLA FASE LAVAGGIO O FERMA DOPO IL TEST PONTICELLO TEST CHIUSO ON STEADY FIXE FISSO BLINKING CLIGNOTANT LAMPEGGIANTE CONDENSER SENSOR OUT OF ORDER SONDE...

Страница 3: ...ter supply and drain connections Final check list Installation practice OPERATING INSTRUCTIONS Start up Operatiobnal checks OPERATING PRINCIPLES How it works Freezing cycle Harvest cycle Control seque...

Страница 4: ...Page 3 Page 3...

Страница 5: ...shown are indicating the production of M medium and L large models For S small models ice production is approx 10 lower Important operating requirements MIN Air temperature 10 C 50 F Water temperatur...

Страница 6: ...16 3 x 230 50 1 7 3 x SPECIFICATIONS MXG 327 MACHINE SPECIFICATIONS Starts Electric power cons amps Kwh x 24 HR Cubes per harvest 72 Large 106 Medium 198 Small At 21 C 70 F water temperature MXG 327...

Страница 7: ...harts shown are indicating the production of M medium and L large models For S small models ice production is approx 10 lower Important operating requirements MIN Air temperature 10 C 50 F Water tempe...

Страница 8: ...9 3 x 1 5 m m2 16 N MXG 427 AS 6 Air Stainless steel MXG 427 WS 6 Water Stainless steel Model Cond unit Finish Water req lt 24 HR SPECIFICATIONS 432 MXG 427 MACHINE SPECIFICATIONS Starts Electric powe...

Страница 9: ...harts shown are indicating the production of M medium and L large models For S small models ice production is approx 10 lower Important operating requirements MIN Air temperature 10 C 50 F Water tempe...

Страница 10: ...9 3 x 1 5 m m2 16 N SPECIFICATIONS MXG 437 MACHINE SPECIFICATIONS Starts Electric power cons amps Kwh x 24 HR Cubes per harvest 72 Large 106 Medium 198 Small At 21 C 70 F water temperature MXG 437 AS...

Страница 11: ...it from the skid Save the two bolts and nuts to mount the machine on storage bin or on top of another Modular Cuber GENERAL INFORMATION AND INSTALLATION 6 Remove all internal support packing and mask...

Страница 12: ...ter supply line and the unit Water supply Water cooled models The water cooled versions of SCOTSMAN Ice Makersrequiretwoseparateinletwatersupplies one for the water sprayed for making the ice cubes an...

Страница 13: ...5 Has the voltage been tested and checked against the data plate rating 6 Has the water supply pressure been checked to ensure a water pressure of at least 1 bar 14 psi 7 Havetheboltsholdingthecompre...

Страница 14: ...wash off any dirt that can have deposited in it during the unit off period Fig 1 B During the water filling operation check to see that the incoming water dribbles through the evaporator platen dribb...

Страница 15: ...out of operation or shortage of water in the water cooled condenser the condenser tem perature rises and when it reaches 70 C 160 F for air cooled version or 60 C 140 F for water cooled version the c...

Страница 16: ...RANSF DATA PROCESSOR ELECTR TIMER DIP SWITCH ELECTRONIC CARD L N RELAYS RELAY TRIAC WATER DRAIN VALVE FIG 4 16 15 14 13 2 1 7 8 9 10 3 4 5 6 11 12 Rx Tx WATER IN VALVE HOT GAS VALVE CONTACTOR COIL FAN...

Страница 17: ...ube size Small Medium Large It is possible however to modify the timed length of the freezing cycle by changing the DIP SWITCH keys setting In Table B of PRINCIPLE OF OPERATION are shown the various t...

Страница 18: ...wing of the same LED to monitor the BIN FULL situation Fig 6 Remove ice cubes out from the ice level control sensors to allow the resumption of the light beam Water inlet valve is energized for 45 sec...

Страница 19: ...d through the suction line In both the accumulator and the suction line it exchanges heat with the refrigerant flowing into the capillary tube warmer before to be sucked in the compressor and to be re...

Страница 20: ...Page 18 Page 18...

Страница 21: ...o switch off the unit in case the condensingtemperatureriseuptomorethen 70 C for air cooled version or more then 62 C for water cooled version for one of the following abnormal reasons CLOGGED CONDENS...

Страница 22: ...vaporator temperature sensor factory pre set is the same for all the models and is not adjustable Once completed the freezing cycle 2nd phase the system goes automatically into the defrost cycle which...

Страница 23: ...e RED LED placed in the front of the P C BOARD This lighting up occures usually in the mid period of the freezing cycle and signals the switching from the first to the second phase of the freezing cyc...

Страница 24: ...eparated printed circuits one at high and the other at low voltage integrated with fuse on power out 6 3 A of four aligned LEDS monitoring the operation of the machine of one extra monitoring RED LED...

Страница 25: ...EEZING HARVEST CYCLE Push for more then 5 during the Freezing cycle the machine goes immediately into Harvest Push for more then 5 during the Harvest cycle the machine enters immediately in the Freezi...

Страница 26: ...h allow to set up the micro processor program in order to extend or to shorten the length of freezing cycle in relation tothedifferentmodelandversionsoficemachines The DIP SWITCH first four keys setti...

Страница 27: ...o parts the valve body and the valve coil Locatedonthehotgasline thisvalveisenergized through the micro processor of P C BOARD during the defrost cycle and as well during the water filling phase Durin...

Страница 28: ...kthecorrisponding length of freezing cycle 2nd phase on Table B 3 Change the same DIP SWITCH KEYS settingsothatitwillcorrespondtothecombination on table B pre ceding the one remarked at step 2 This wi...

Страница 29: ...Page 27 Page 27 WIRING DIAGRAM MXG 327 427 437 A 230 50 1...

Страница 30: ...Page 28 Page 28...

Страница 31: ...f order Replace it Red alarm LED blink Freezing or Bin Full LED Ice Level Control out of order Replace it Red alarm LED blink alternatively Compressor cycles intermittently Low voltage Check circuit f...

Страница 32: ...mp Hot gas solenoid valve leaking Replace valve Short of refrigerant Charge to data plate indication Discharge head pressure too high See incorrect discharge pressure Poor harvest Restriction in incom...

Страница 33: ...individual useroperation Continuouscheckoftheclarity of ice cubes and visual inspection of the watersprayingpartsbeforeandaftercleaning will indicate frequency and procedure to be followed in local ar...

Страница 34: ...T OF THE REACH OF CHILDREN 4 Scoop out all the ice cubes stored into the bin in order to prevent them from being contaminated with the cleaning solution then flush out the water from the sump reservoi...

Страница 35: ...then turn the main switch to OFF disconnect unit from POWER 14 Flush out the rinsing solution from the sump reservoirs 15 Place again the evaporator cover and the unit service panels 16 Give POWER to...

Страница 36: ...tes 21 Place again the evaporator cover and the unit service panels 22 At completion of the freezing and harvest cycle make sure of proper texture and clearness of the ice cubes and that they do not h...

Отзывы: