Scotsman FME1204R Скачать руководство пользователя страница 9

FOR THE PLUMBER

CONFORM TO ALL APPLICABLE CODES

Water Inlet

Connect a cold potable water supply

to the ice machine. Use 3/8" O.D.

copper tubing and connect it to the

3/8" male flare at the back of the

cabinet.
Install a hand valve near the machine

to control the water supply.

Drains

The cabinet has a ¾" FPT drain.

connection. The drain is at the back of

the cabinet, the drain line is of the

gravity type, and 1/4 inch per foot fall

is an acceptable pitch for the drain

tubing. There should be a vent at the

highest point of the drain line, and the

ideal drain receptacle would be a

trapped and vented floor drain. Use

only ¾" rigid tubing.

Storage Bin:

Install a

separate

gravity drain to the ice storage bin.

Insulation of this drain line is

recommended.

NME954R & FME1204R

January 2000

Page 9

Floor Drain

Vent Bin Drain

3/4" FPT

Vent Ice

Maker

Drain, 3/4"

FPT

Water Inlet

3/8" Male Flare

Field Supplied

Water Filter

Hand Shut

Off Valve

Connect To

Cold Water

Содержание FME1204R

Страница 1: ...Location Page 8 FOR THE PLUMBER Page 9 FOR THE ELECTRICIAN Page 10 FOR THE ELECTRICIAN Fan Relay Kit Page 11 FOR THE INSTALLER Completed Installation Page 12 FOR THE INSTALLER Final Check List Page 13...

Страница 2: ...KBT46 and KDIL N 250 Lancer nugget IBD use KDIL N L Lancer kit NME954R FME1204R January 2005 Page 2 Liquid Line Connection Discharge Line Connection Remote Condenser Junction Box Electrical Inlet Wate...

Страница 3: ...BEHIND FRONT PANEL Model Use with Basic Electrical ERC151 32 1 FME1204R or 1 NME954R 208 230 60 1 ERC302 32 1 or 2 FME1204Rs or NME954Rs SAME ERC DIMENSIONS A B F G 33 3 8 10 3 4 16 3 4 11 5 8 Adjusta...

Страница 4: ...ne it up so it is even with the back side Secure the machine to the bin with the hardware provided with the machine Remove the front panel and remove any shipping blocks Note Be sure to allow a 6 mini...

Страница 5: ...hd Calculated Line Length Configurations that do NOT meet these requirements must receive prior written authorization from Scotsman Do NOT Route a line set that rises then falls then rises Route a li...

Страница 6: ...chrader valve connection that end goes to the condenser Note The openings in the building ceiling or wall listed in the next step are the minimum sizes recommended for passing the refrigerant lines th...

Страница 7: ...Using two wrenches one to rotate the swivel nut and one to hold the tubing tighten each coupling It is CRITICAL that ONLY the NUT on the pre charged tube be turned or the diaphragms will be torn loos...

Страница 8: ...R January 2000 Page 8 FOR THE INSTALLER Location TWO UNITS ON ONE CONDENSER REMOTE CONDENSER EXCESS PRECHARGED TUBING INSIDE BUILDING ICE MAKERS SERVICE ACCESS SERVICE ACCESS SIDE AND BACK ROOF CUTAWA...

Страница 9: ...line is of the gravity type and 1 4 inch per foot fall is an acceptable pitch for the drain tubing There should be a vent at the highest point of the drain line and the ideal drain receptacle would be...

Страница 10: ...or and the fan motor operates whenever the compressor operates Electrical connections are made at the junction box at the back of the ice maker and at the junction box on the remote condenser The remo...

Страница 11: ...e checked as incorrect phasing will result in a failure of the kit relay Below is an illustration of the KCMR230 terminal strip Note that each terminal is marked 1 2 3 4 5 6 For proper phasing Termina...

Страница 12: ...ER Completed Installation Roof Cut Away Insulated Precharged Refrigerant Tubing A typical installation should generally appear as illustrated below The best place for the remote condenser is above the...

Страница 13: ...the machine been secured to the bin 8 If two units on one condenser has the relay kit been installed 9 Is there a water shut off valve installed near the machine 10 Is the remote condenser installed p...

Страница 14: ...Valve 4 Turn the master switch on The electrical start up sequence is automatic There will be a short 15 second delay before the gear motor starts and the liquid line valve opens After the liquid lin...

Страница 15: ...evel Sensor Senses if there is water in the reservoir to make ice out of Will shut the machine off it there is none Ice Discharge Chute Directs the ice produced by the evaporator into the storage bin...

Страница 16: ...are for ice level and water level The relays are for the gear motor with a built in time delay to clear the evaporator of ice when the unit turns off and for the liquid line valve Potential Relay The...

Страница 17: ...ve closes stopping refrigerant flow The pump down control opens after the suction pressure falls to its cut out point The compressor contactor opens The compressor stops The auger motor stays on for 1...

Страница 18: ...reservoir which it enters through the float valve The water them goes out the bottom of the reservoir tank to the bottom of the evaporator Reservoir overflow or evaporator condensation is routed to th...

Страница 19: ...ors get less At the evaporator the refrigerant enters an area of relatively low pressure where it can easily boil off or evaporate As it evaporates it absorbs heat from the evaporator and whatever is...

Страница 20: ...from the condenser to the receiver NME954R FME1204R January 2000 Page 20 PUMP DOWN During the pump down cycle usually initiated by the circuit board de energizing the liquid line valve the discharge g...

Страница 21: ...mpty switch the master switch to OFF 11 After draining the reservoir as in step 6 wash and rinse the water reservoir 12 Go thru steps 13 19 to sanitize the ice machine water system 13 Mix two gallons...

Страница 22: ...by a probe located in the water reservoir At least twice a year the probe should be removed from the reservoir and the tip wiped clean of mineral build up 3 Clean the remote condenser Use a vacuum cle...

Страница 23: ...the bearing and breaker should be removed to check the action of the bearing It should rotate smoothly To remove the breaker remove the lower ice chute then take out all four allen head cap screws and...

Страница 24: ...moval and replacement of these parts see REMOVAL AND REPLACEMENT 1 To remove the auger remove the front and top panels 2 Push back bail clamp holding ice chute cover to ice chute and remove cover 3 Un...

Страница 25: ...cause of high amp draw including bearings gear motor condition and scale on auger evaporator Pump down pressure control open very low suction pressure Auger not turning due to motor failure auger rela...

Страница 26: ...stricted Clean out drain Tubing cracked Replace tubing Condensation on drain tubing Insulate tubing Hose off Re attach hose Reservoir cover off Return cover to reservoir Reservoir cracked Replace rese...

Страница 27: ...r contactor coil If it is on the ice sensors may be blocked Remove them and check for mineral scale Scotsman s test box can also be used to determine if the ice sensors or board are defective Using th...

Страница 28: ...ssemble BIN CONTROLS Ice Level Sensors 1 Disconnect electrical power 2 Remove front panel 3 Remove control box cover 4 Locate ice chute at the base of the chute in front of and behind it are two plast...

Страница 29: ...e breaker to remove the bearing and replace it an arbor press is needed b Replace lower seals before installing new bearing in breaker Note seals must be pressed in with a tool such as 2 PCV coupling...

Страница 30: ...a slide hammer type puller to pull on the auger at the threaded hole The size of that hole is 5 8 18 Inspect the auger the critical areas of the auger are a The auger body It should be clean and shin...

Страница 31: ...and pull the water seal down against it 3 The part of the water seal that rotates with the auger must also be replaced Remove the old part from the auger and clean the mounting area 4 Place a small be...

Страница 32: ...id line 7 Evacuate the system until dehydrated then weigh in the nameplate charge Check for leaks 8 Install auger breaker breaker bearing assembly and ice discharge chute in reverse order of disassemb...

Страница 33: ...r bearings and shaft are one pressed together assembly Replace as a unit C Inspect the oil gears and bearings If the oil level and condition is acceptable quickly check the gears and bearings They are...

Страница 34: ...frigerant or HFC 134a will work Check with the leak detector manufacturer if in doubt Access Valves To use the access valves Remove the cap from the stem use a 3 16 allen wrench to check that the valv...

Отзывы: