Page 2
Page 2
Table of contents
page
Specifications EC 45
Specifications EC 55
Specifications EC 85
Specifications EC 105
Specifications EC 125
Specifications EC 175
GENERAL INFORMATION AND INSTALLATION
Introduction
Unpacking and Inspection
Location and levelling
Electrical connections
Water supply and drain connections
Final check list
Installation practice
OPERATING INSTRUCTIONS
Start up
Operational checks
OPERATING PRINCIPLES (How it works)
Freezing cycle
Harvest cycle
Control sequence
Component description
ADJUSTMENT, REMOVAL AND REPLACEMENT PROCEDURES
Adjustment of the cube size
Wiring diagram EC 45-55-85-105
Wiring diagram EC 125-175
Service diagnosis
MAINTENANCE AND CLEANING INSTRUCTIONS
General
Icemaker
Cleaning instructions of water system
INDICE
2
3
5
7
9
11
13
35
36
37
38
15
15
15
15
16
17
17
18
19
24
27
30
31
41
41
42
Содержание EC 105
Страница 25: ...Page 25 Page 25 FIG A FIG B FIG C FIG D ...
Страница 26: ...Page 26 Page 26 FIG E FIG F FIG G FIG H ...
Страница 36: ...Page 36 Page 36 WIRING DIAGRAM EC 45 55 85 105 AIR WATER COOLED 230 50 60 1 ...
Страница 37: ...Page 37 Page 37 WIRING DIAGRAM EC 125 175 AIR WATER COOLED 230 50 60 1 ...