After applying the seals to the base connection surfaces, lower the base of the observatory to the
slab by removing the spacers. If possible, apply additional sealant to the surfaces where the spacers
once were. The entire base will be riding on a bed of sealant; glide entire base into position to align
anchor holes positions to holes in the slab. Apply anchors, tighten these to specification.
Figure. 17
–
mounting the base with anchors
Next, both halves of the base of the observatory are secured by the supplied M6x25 bolts and nuts,
placing them in pre-prepared holes.
Figure. 18
–
connecting the bases of the observatory with screws