• When the shipment arrives, inspect the packaging exterior for damage. If there is any damage, then note any
issues on the delivery receipt and notify SCIEX immediately.
• Contact SCIEX Customer Service or the local FSE to schedule the installation.
FSE Responsibilities
Note:
If the site preparation tasks are not complete when the SCIEX Field Service Employee (FSE) arrives, then
the scheduled installation will be postponed.
• Review the checklist and discuss outstanding issues with the site planner.
• Unpack and set up the CE equipment.
• Verify the performance of the system.
During Installation
WARNING! Lifting Hazard. Make sure that at least four people or a lifting device
are available to lift the CE system. Follow established safe lifting procedures. Refer
to the Site Planning Guide for the weights of system components.
The FSE unpacks the system (with the assistance of customer staff), sets up the system, and then confirms its
operation. When the system is installed, the FSE conducts an installation qualification.
Customer Familiarization
During installation, the FSE provides a system and software overview, reviews data, and provides some basic
operator familiarization.
Technical Support
SCIEX and its representatives maintain a staff of fully-trained service and technical specialists located throughout
the world. They can answer questions about the system or any technical issues that might arise. For more
information, visit the SCIEX website at
.
Site Planning Guide