© 2017 Surge Suppression, LLC                                                                NN00141 

       Rev. Date:  5/17/2017 

 

 

 

 

 

 

 

 
 

 

Installation Instruction for 

 Three Phase High-Leg Delta,  

120/240 Volt, 5-wire Suppressors  

with Internal Fusing (three phases, 

neutral and ground)

 

WARNING  -  HAZARDOUS  VOLTAGES  ARE  PRESENT. 

Improper  installation  may  result  in  serious  injury  to  the  installer  and/or  damage  to  the 

electrical system or related equipment. Read all instructions before beginning the installation. Safety equipment must be used as prescribed by OSHA, 
whenever working around hazardous voltages. 

Failure  of  unit  and/or  consequential  equipment  damage  due  to  improper  installation  or  misapplication  is  not  covered  by  the  product 
warranty.  

Voltage  measurements  and 

installation  must  be  completed  by  a  licensed/qualified  electrician

  in  accordance  with  the  National  and/or  Canadian 

Electric Code, State, and Local codes.  These requirements supersede this instruction. 

POWER MUST BE REMOVED FROM THE ELECTRICAL SYSTEM BEFORE INSTALLING THE UNIT. 

INSTALLATION MATERIALS REQUIRED

  

The  following  is  a  list  of  materials  that  may  be  needed  for  proper  installation  of  this  Surge  Protective  Device  (SPD).    This  list  is  intended  to  help  the  installer  anticipate 
materials needed for a successful installation.  The installer should become familiar with the scope of work to avoid lost time and improper installation.  Failure to use fittings 
that are “Listed” will void the “Listing” of the SPD. 

 

For Splices:  3 (or more) cable taps; such as: NSI IPCS- 2001 or 7501 (per Code). 

 

Attachment Hardware:  Use (four) screws or anchor toggle bolts, flat washers and lock washers.  

 

¾” hub (included with most models). 

 

Tools:  Drill & bits, Mechanical Knock Out Set, Channel Locks™,  Level, Screwdrivers, Appropriate Safety Equipment.

 

WIRING DIAGRAM 

This device is suitable for use on a circuit capable of delivering not more than 200,000 RMS symmetrical 
Amperes, for the respective models’ (max.) nominal voltage shown in the Table of Maximum Suggested 
Operating Voltages on page 2. 

The SPD is equipped with integral fuses.  This allows the device to be installed directly to the system bus 
bars,  to  the  main  lugs  in  a  panel  or  disconnect,  or  to  a  circuit  breaker.    Consult  NEC/CEC,  State  and 
Local Codes to assure compliance

In the event that one of the LED status indicators fail to illuminate, the entire device should be returned 
for warranty replacement.  If service of the device is a consideration (i.e: removal and replacement), and 
there  is  no  means  to  remove  power  from  the  SPD  without  removing  power  from  the  entire  system,  the 
installation should incorporate a disconnect device between the SPD and the system connecting point. 

 The  design  of  these  units  provides  superior  protection  for  sensitive/critical  equipment  connected  to 
distribution  panels,  sub-distribution  panels  or  individual  equipment  disconnects.    These  units  are 
designed for use at IEEE C62.41 Location Categories A, B, and C.  “Voltage Responsive” type units are 
designed to be used in 50 to 420 Hz applications. NOTE: SPDs with model numbers beginning with the 
letter “C” are “Frequency Responsive” (Sinewave tracking) units and are designed to be used in 50 to 60 
Hz  applications  only  and  shall  not  be  used  at  locations  where  the  voltage  frequency  fluctuates  (i.e.:  on 
the output of variable frequency drives).  

When inspecting the panel prior to installation, make a visual check that there are no Neutral to Ground 
bonds that violate the NEC/CEC. 

Note:  Pre-existing breakers of the rated load size 

(30 

amp, etc.), that are serving existing loads, may be 

utilized  if  the  breaker  is  “Listed”  for  this  application  (see  NEC

and  provided  the  owner/tenant  has 

authorized multiple conductor termination. 

[ex.:  NEC ‘10-foot tap rule’ for direct bus tapping.].

 

 

NOTE FOR ISOLATED GROUND       

If the electrical system uses an isolated ground, connect the SPD ground to the isolated ground bus. 

EXCEPTION FOR METAL ENCLOSURES AND/OR METALLIC HUBS 

– 

For metal enclosures and/or metallic hubs, the SPD ground wire is bonded to the enclosure internally.  If the system uses an isolated ground, the SPD enclosure must be 

isolated from the panel or load it is being connected to through the use of an insulated conduit fitting or other “Listed” fitting.  In this installation, the ground wire from the SPD 
must terminate at the isolated ground bus.

 

BEFORE INSTALLATION 

 

For proper performance, the SPD must be installed with the shortest lead length possible.    Sharp bends should be avoided. 

No position-oriented components are used in the units.  Devices can be mounted upside down or sideways allowing for shortest possible lead lengths. There are a few basic 
principles for surge suppression installation. They are: 

1. 

For proper performance, the SPD must be installed with the wires as short and straight as humanly possible. Any sharp bend in the wire is unacceptable! 
This applies to phase, neutral, and ground leads.  The objective is to reduce the lengths of wire provided on each unit, not add to it. The priority is to the 
phase leads, then the neutral, and then the ground lead. 

2. 

Install the SPD on the side of the panel closest to the neutral bus, if present, and use a breaker on the same side. 

3. 

Use a breaker close to the neutral bus and the SPD to keep the wires as short and straight as humanly possible. 

4. 

The ground  wire may be connected to the panel by using a ground lug installed near the SPD in the can or  frame  as they are grounded. (See exception 
above for Isolated Grounds).

 

15424 Flight Path Drive  

Brooksville, FL 34604 

Phone (888) 987-8877 

Fax (352) 799-6987 

[email protected]

 