background image

 

 

SCHWING GMBH – Separate Placing Booms SPB 

02/2014 

 
 

7

To be fixed  2-3 floors slabs (depending on the floor height) to ensure the 

requested stability. The boom can be mounted on a 20 m column inside the 

building with a max. free standing height of 15 m above the last floor frame . 

 

 

1x  Hydraulic  climbing  device  (75  Kg  each 

cylinder) 

  for  automatic  lifting  of  the  tubular  mast 

and placing boom, consisting of: 

  1  set  climbing  cylinders  actuated  by 

means  of  a  hand  lever  at  the  control 
block or via remote control - push button 
and  approx.  15 m  cable,  suspensions 
with socket pins. 

 

 
 
 
 

3x floor frames (272 Kg each) 
with 2 each eccentric pins and guide  
rollers, 2 small cross bolt + 8 wedges 

 
   
 

 

 

 

 

 

1x Cross frame (755 Kg) 
 
 
 
 
 
 

Содержание SPB 25

Страница 1: ...SEPARATE PLACING BOOMS SPB...

Страница 2: ...ructions 12 1 5 1 General points to consider when using placing booms 12 1 5 2 Safety aspects 13 1 5 3 TOOLS REQUIRED FOR ASSEMBLY 15 1 6 Working range 16 1 6 1 SPB 25 16 1 6 2 SPB 28 17 1 6 3 SPB 32...

Страница 3: ...concrete Added time savings are realized by the tower crane being free to handle other lifting operations Years ago already the trend to rationalization and short completion periods led to the use of...

Страница 4: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 3 1 2 Installation method Free standing up to 20 m Through the floor slabs Directly on cross frame...

Страница 5: ...ans of hand levers or installed electric remote control cable end hose and connecting line for connection to the delivery pipeline Trestle pin connection for quick separation when repositioning the pl...

Страница 6: ...pipeline DN 125 Horizontal reach from centre of rotating axis max 28 m Slewing range folding 530 Length of end hose 4 m Electric engine power 400 V 50 cps protection mode IP 44 30 kW Total weight of...

Страница 7: ...with hydraulic oil with pin connection on main boom to reduce handling weight 2 Accessories Supplemental Equipment for Concrete Placing Boom 1x Tubular head part 638 Kg for SPB 28 and 32 849 Kg for S...

Страница 8: ...5 m above the last floor frame 1x Hydraulic climbing device 75 Kg each cylinder for automatic lifting of the tubular mast and placing boom consisting of 1 set climbing cylinders actuated by means of a...

Страница 9: ...h back protection 3 Climbing procedure During the climbing operations the boom column must be guided and supported by three climbing guide frames These frames transfer the occurring forces into the co...

Страница 10: ...When the climbing cylinders are fully extended insert a supporting pin 1 Fig 2 on both sides above the guide frame 5 The safety latches 2 Fig 2 of the supporting pins must be inserted into the next hi...

Страница 11: ...op When this position is reached the climbing equipment and the climbing guide frame must be relocated Fig 1 if climbing is to continue To do so Move the climbing equipment to the next higher floor an...

Страница 12: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 11...

Страница 13: ...ion must be paid to the condition of the machine while on site it must be inspected regularly by a competent person and a report placed in the safety file 7 The site electrician should inspect on a re...

Страница 14: ...working area needs to be properly cordoned off and clear of any trip hazards It needs to be of sufficient size to allow ease of access and egress for the assembly personnel Every operative must wear t...

Страница 15: ...crete delivery pipeline is approximately 5 500 kg A crane of sufficient capacity is required for the operation of lifting the column on top of the heavy duty cross frame Otherwise the column must be a...

Страница 16: ...THE FIXINGS ON THE WORKING PLATFORM AND TRAP DOOR ASSEMBLY 3 HAMMER FOR DRIVING IN OUT THE CONNECTION PINS ON THE BOOM TO MAST CONNECTION OR THE BOOM ARM TO TURRET CONNECTION 4 HYDRAULIC TORQUE WRENCH...

Страница 17: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 16 5 Working range 5 1 1 SPB 25...

Страница 18: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 17 5 1 2 SPB 28...

Страница 19: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 18 5 1 3 SPB 32...

Страница 20: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 19 5 1 4 SPB 35...

Страница 21: ...G GMBH Separate Placing Booms SPB 02 2014 20 6 Examples for load drawings Please note that in case of other dimensions on site new Load calculations have to be made and adapted to the real situation o...

Страница 22: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 21 6 1 1 SPB 25 in slab distance 3m no counterweight...

Страница 23: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 22 6 1 2 SPB 28 freestandig with 18m column no counterweight...

Страница 24: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 23 6 1 3 SPB 28 freestandig with 18m column with counterweight...

Страница 25: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 24 6 1 4 SPB 28 in slab distance 3 2m no counterweight...

Страница 26: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 25 6 1 5 SPB 32 in slab distance 4 0m no counterweight...

Страница 27: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 26 6 1 6 SPB 35 in slab distance 4 5m no counterweight...

Страница 28: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 27 Solutions for concrete...

Отзывы:

Похожие инструкции для SPB 25