SCHWING GMBH – Separate Placing Booms SPB 

02/2014 

 
 

13

 

4.1.2 Safety aspects 

When assembling the Schwing separate placing boom system on the octagonal 

column accessories, it needs to be recognised that although the system is 

designed to be simple to use, the components are of a robust construction and as 

such are heavy to handle. A dedicated crane is required for the initial installation. 

When these operations are carried out on a site all of the site management needs 

to be made aware of the cranes intensive use during the erection. 

A banks man must be with the assembly team at all times. It must be realised that 

for ease of assembly all the components must be slung level, trying to force the 

items together is tiring, awkward and with the close proximity of operatives’ hands 

to the connection points, failure to sling items correctly will create a hazard. 

The working area needs to be properly cordoned off and clear of any trip hazards. 

It needs to be of sufficient size to allow ease of access and egress for the 

assembly personnel. 

Every operative must wear the required PPE and safety harnesses and fall arrest 

equipment must be supplied to those who will be climbing the mast to carry out 

final connection. 

Precaution should be taken regarding tools that have to be used on the working 

platform of the mast, the ladders have safety hoops attached restricting the 

person on the ladder from being able to carry any bulky items. 

A simple idea is to have rope hanging from the working platform hand rail, (this 

should only be during installation) and a tool bag that can be closed, hence the 

tools once in the bag are then fastened to the rope and hoisted to the work area. 

When used with a heavy duty cross frame, the holding down bolts must be M36 

diameter and of 8.8 grade. Schwing can give the correct tensile and compressive 

loads and it is then up to the bolt supplier to give the correct torque settings for 

these bolts. 

Содержание SPB 25

Страница 1: ...SEPARATE PLACING BOOMS SPB...

Страница 2: ...ructions 12 1 5 1 General points to consider when using placing booms 12 1 5 2 Safety aspects 13 1 5 3 TOOLS REQUIRED FOR ASSEMBLY 15 1 6 Working range 16 1 6 1 SPB 25 16 1 6 2 SPB 28 17 1 6 3 SPB 32...

Страница 3: ...concrete Added time savings are realized by the tower crane being free to handle other lifting operations Years ago already the trend to rationalization and short completion periods led to the use of...

Страница 4: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 3 1 2 Installation method Free standing up to 20 m Through the floor slabs Directly on cross frame...

Страница 5: ...ans of hand levers or installed electric remote control cable end hose and connecting line for connection to the delivery pipeline Trestle pin connection for quick separation when repositioning the pl...

Страница 6: ...pipeline DN 125 Horizontal reach from centre of rotating axis max 28 m Slewing range folding 530 Length of end hose 4 m Electric engine power 400 V 50 cps protection mode IP 44 30 kW Total weight of...

Страница 7: ...with hydraulic oil with pin connection on main boom to reduce handling weight 2 Accessories Supplemental Equipment for Concrete Placing Boom 1x Tubular head part 638 Kg for SPB 28 and 32 849 Kg for S...

Страница 8: ...5 m above the last floor frame 1x Hydraulic climbing device 75 Kg each cylinder for automatic lifting of the tubular mast and placing boom consisting of 1 set climbing cylinders actuated by means of a...

Страница 9: ...h back protection 3 Climbing procedure During the climbing operations the boom column must be guided and supported by three climbing guide frames These frames transfer the occurring forces into the co...

Страница 10: ...When the climbing cylinders are fully extended insert a supporting pin 1 Fig 2 on both sides above the guide frame 5 The safety latches 2 Fig 2 of the supporting pins must be inserted into the next hi...

Страница 11: ...op When this position is reached the climbing equipment and the climbing guide frame must be relocated Fig 1 if climbing is to continue To do so Move the climbing equipment to the next higher floor an...

Страница 12: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 11...

Страница 13: ...ion must be paid to the condition of the machine while on site it must be inspected regularly by a competent person and a report placed in the safety file 7 The site electrician should inspect on a re...

Страница 14: ...working area needs to be properly cordoned off and clear of any trip hazards It needs to be of sufficient size to allow ease of access and egress for the assembly personnel Every operative must wear t...

Страница 15: ...crete delivery pipeline is approximately 5 500 kg A crane of sufficient capacity is required for the operation of lifting the column on top of the heavy duty cross frame Otherwise the column must be a...

Страница 16: ...THE FIXINGS ON THE WORKING PLATFORM AND TRAP DOOR ASSEMBLY 3 HAMMER FOR DRIVING IN OUT THE CONNECTION PINS ON THE BOOM TO MAST CONNECTION OR THE BOOM ARM TO TURRET CONNECTION 4 HYDRAULIC TORQUE WRENCH...

Страница 17: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 16 5 Working range 5 1 1 SPB 25...

Страница 18: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 17 5 1 2 SPB 28...

Страница 19: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 18 5 1 3 SPB 32...

Страница 20: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 19 5 1 4 SPB 35...

Страница 21: ...G GMBH Separate Placing Booms SPB 02 2014 20 6 Examples for load drawings Please note that in case of other dimensions on site new Load calculations have to be made and adapted to the real situation o...

Страница 22: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 21 6 1 1 SPB 25 in slab distance 3m no counterweight...

Страница 23: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 22 6 1 2 SPB 28 freestandig with 18m column no counterweight...

Страница 24: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 23 6 1 3 SPB 28 freestandig with 18m column with counterweight...

Страница 25: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 24 6 1 4 SPB 28 in slab distance 3 2m no counterweight...

Страница 26: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 25 6 1 5 SPB 32 in slab distance 4 0m no counterweight...

Страница 27: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 26 6 1 6 SPB 35 in slab distance 4 5m no counterweight...

Страница 28: ...SCHWING GMBH Separate Placing Booms SPB 02 2014 27 Solutions for concrete...