vi
Permanent Tie-Downs ................................................................................. 6-3
Temporary Tie-Downs.................................................................................. 6-5
Flight Line Tie-Downs .................................................................................. 6-5
Tie-down Ropes and Straps ......................................................................... 6-6
Use of Open Air Trailers............................................................................... 6-6
Erection Procedure ...................................................................................... 6-6
Annex A - Glider Daily Inspection ............................................................... A-1
Annex B - Glider Open-Air Trailer Loading Checklist .................................. B-1
Annex C - Glider Final Assembly Checklist ................................................. C-1
Annex D - Glider Maintenance Flight Card.................................................. D-1
Содержание 2-33
Страница 2: ......
Страница 12: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 1 4 Figure 1 2 Cockpit Figure 1 3 Example Instrument Panel ...
Страница 20: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 2 8 Page intentionally left blank ...
Страница 32: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 3 12 Page intentionally left blank ...
Страница 45: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 6 7 RCA Ops O or RC Eng O ...
Страница 46: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 6 8 ...
Страница 52: ...A CR CCP 402 MB 001 2 33 AOIs C 2 ...