Relay Commissioning
7-31
SEL-300G Instruction Manual
Date Code 20060731
Select optional TestPoint3 such that:
TestPoint1 < TestPoint3 < 24D2P2
100
VNOM
•
TestPoint3
Vtest3
=
V secondary
Vtest3 = ___________ V secondary
Select TestPoint2 such that:
TestPoint2 > 24D2P2
100
VNOM
•
TestPoint2
Vtest2
=
V secondary
Vtest2 = ___________ V secondary
Select optional TestPoint4 such that:
TestPoint4 > TestPoint2
100
VNOM
•
TestPoint4
Vtest4
=
V secondary
Vtest4 = ___________ V secondary
Step 2.
Based on the two timing test descriptions above (SER or output contact driving an
external timer), select one method and make the settings and connections necessary to
support the selection. Configure the voltage test source to apply balanced, three-phase
voltages with magnitudes equal to Vtest1.
Step 3.
Apply the test voltages and record the element operating time, Ttest1. Remove the
test voltages for at least 24CR seconds to permit the element to fully reset. Repeat
using Vtest2, Vtest3, and Vtest4.
Ttest1 = _________ seconds
Ttest2 = _________ seconds
Ttest3 = _________ seconds
Ttest4 = _________ seconds
Step 4.
Calculate the relay timing errors at each test point using the equation:
% error1 and error3 =
100
•
24D2D1
24D2D1
Ttestn
⎟
⎠
⎞
⎜
⎝
⎛
−
% error2 and error4 =
100
•
24D2D2
24D2D2
Ttestn
⎟
⎠
⎞
⎜
⎝
⎛
−
% error1 = _________
% error2 = _________
Содержание SEL-300G
Страница 1: ...SEL 300G Multifunction Generator Relay Instruction Manual 20060731 PM300G 01 NB ...
Страница 4: ......
Страница 6: ......
Страница 138: ......
Страница 166: ......
Страница 170: ......
Страница 288: ......
Страница 290: ......
Страница 328: ......
Страница 442: ......
Страница 456: ......
Страница 458: ......
Страница 468: ......
Страница 470: ......
Страница 512: ......
Страница 516: ......
Страница 518: ......
Страница 552: ......
Страница 554: ......
Страница 560: ......
Страница 578: ......
Страница 626: ......
Страница 724: ......
Страница 728: ......