G-30
Appendix G
Date Code 20010518
SEL-2020 Instruction Manual
SEL
SEL
SEL
SEL----121D/221D:
121D/221D:
121D/221D:
121D/221D:
100(R)
Meter Date stamp
Month
1-12
101(R)
Meter Date stamp
Day of the Month
1-31
102(R)
Meter Date stamp
Year
0-99
103(R)
Meter Time stamp
Hours
0-23
104(R)
Meter Time stamp
Minutes
0-59
105(R)
Meter Time stamp
Seconds
0-59
106(R)
Meter Time stamp
Milliseconds
0-999
107(R)
Meter Date stamp
Day of the week (Sunday-0, Monday-1, ...) 0-6
108(R)
Phase Current IA
A, primary
0-32767 A, pri
109(R)
Phase Current IB
A, primary
0-32767 A, pri
110(R)
Phase Current IC
A, primary
0-32767 A, pri
111(R)
Difference Voltage VAB
kV/10, primary
0.0-3276.7 kV, pri
112(R)
Difference Voltage VBC
kV/10, primary
0.0-3276.7 kV, pri
113(R)
Difference Voltage VCA
kV/10, primary
0.0-3276.7 kV, pri
114(R)
Real Power P
MW/10, primary
±3276.7 MW, pri
115(R)
Reactive Power Q
MVAR/10, primary
±3276.7 MVAR, pri
SEL
SEL
SEL
SEL----121F/221F,
121F/221F,
121F/221F,
121F/221F,----1,
1,
1,
1,----2,
2,
2,
2,----3,
3,
3,
3,----8:
8:
8:
8:
100(R)
Meter Date stamp
Month
1-12
101(R)
Meter Date stamp
Day of the Month
1-31
102(R)
Meter Date stamp
Year
0-99
103(R)
Meter Time stamp
Hours
0-23
104(R)
Meter Time stamp
Minutes
0-59
105(R)
Meter Time stamp
Seconds
0-59
106(R)
Meter Time stamp
Milliseconds
0-999
107(R)
Meter Date stamp
Day of the week (Sunday-0, Monday-1, ...) 0-6
108(R)
Phase Current IA
A, primary
0-32767 A, pri
109(R)
Phase Current IB
A, primary
0-32767 A, pri
110(R)
Phase Current IC
A, primary
0-32767 A, pri
111(R)
Difference Current IAB
A, primary
0-32767 A, pri
112(R)
Difference Current IBC
A, primary
0-32767 A, pri
113(R)
Difference Current ICA
A, primary
0-32767 A, pri
114(R)
Residual Current IR
A, primary
0-32767 A, pri
115(R)
Phase Voltage VA
kV/10, primary
0.0-3276.7 kV, pri
116(R)
Phase Voltage VB
kV/10, primary
0.0-3276.7 kV, pri
117(R)
Phase Voltage VC
kV/10, primary
0.0-3276.7 kV, pri
118(R)
Difference Voltage VAB
kV/10, primary
0.0-3276.7 kV, pri
119(R)
Difference Voltage VBC
kV/10, primary
0.0-3276.7 kV, pri
120(R)
Difference Voltage VCA
kV/10, primary
0.0-3276.7 kV, pri
121(R)
Synchronizing Voltage VS
kV/10, primary
0.0-3276.7 kV, pri
122(R)
Real Power P
MW/10, primary
±3276.7 MW, pri
123(R)
Reactive Power Q
MVAR/10, primary
±3276.7 MVAR, pri
SEL
SEL
SEL
SEL----151/251,
151/251,
151/251,
151/251,----1,
1,
1,
1,----2,
2,
2,
2,----3; SEL
3; SEL
3; SEL
3; SEL----151C/251C,
151C/251C,
151C/251C,
151C/251C,----1,
1,
1,
1,----2,
2,
2,
2,----3:
3:
3:
3:
100(R)
Meter Date stamp
Month
1-12
101(R)
Meter Date stamp
Day of the Month
1-31
102(R)
Meter Date stamp
Year
0-99
103(R)
Meter Time stamp
Hours
0-23
104(R)
Meter Time stamp
Minutes
0-59
105(R)
Meter Time stamp
Seconds
0-59
106(R)
Meter Time stamp
Milliseconds
0-999
107(R)
Meter Date stamp
Day of the week (Sunday-0, Monday-1, ...) 0-6
108(R)
Phase Current IA
A, primary
0-32767 A, pri
109(R)
Phase Current IB
A, primary
0-32767 A, pri
110(R)
Phase Current IC
A, primary
0-32767 A, pri
111(R)
Residual Current IR
A, primary
0-32767 A, pri
112(R)
Negative-Sequence Current 3I2
A, primary
0-32767 A, pri
113(R)
Real Power P
MW/10, primary
±3276.7 MW, pri
114(R)
Reactive Power Q
MVAR/10, primary
±3276.7 MVAR, pri
115(R)
Phase Voltage VA
kV/10, primary
0.0-3276.7 kV, pri
116(R)
Phase Voltage VB
kV/10, primary
0.0-3276.7 kV, pri
117(R)
Phase Voltage VC
kV/10, primary
0.0-3276.7 kV, pri
118(R)
Zero-Sequence Voltage 3V0
kV/10, primary
0.0-3276.7 kV, pri
119(R)
Difference Voltage VAB
kV/10, primary
0.0-3276.7 kV, pri
Содержание SEL-2020
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 18: ......
Страница 23: ...5 Figure 2 SEL 2020 Front and Rear Panels ...
Страница 33: ...15 Figure 6 SEL 2020 Panel Cutout and Drill Plan for Panel Mount Models ...
Страница 38: ......
Страница 84: ...4 2 Job Done Examples Date Code 20010518 SEL 2020 Instruction Manual This Page Intentionally Left Blank ...
Страница 106: ...4 24 Job Done Examples Example 2 Date Code 20010518 SEL 2020 Instruction Manual This Page Intentionally Left Blank ...
Страница 126: ...4 44 Job Done Examples Example 4 Date Code 20010518 SEL 2020 Instruction Manual This Page Intentionally Left Blank ...
Страница 142: ...4 60 Job Done Examples Example 7 Date Code 20010518 SEL 2020 Instruction Manual This Page Intentionally Left Blank ...
Страница 148: ...4 66 Job Done Examples Example 8 Date Code 20010518 SEL 2020 Instruction Manual This Page Intentionally Left Blank ...
Страница 152: ......
Страница 154: ......
Страница 178: ......
Страница 244: ......
Страница 246: ......
Страница 256: ......
Страница 258: ......
Страница 272: ......
Страница 274: ......
Страница 296: ......
Страница 298: ......
Страница 304: ......
Страница 308: ......
Страница 336: ......
Страница 338: ......
Страница 344: ......
Страница 352: ......
Страница 446: ......
Страница 470: ......