
6.2 Maintenance plan
35
Table 6.2 Maintenance plan 2
Activity
Interval
Aids
Person
Check cover scraper,
adjust or replace if re-
quired.
Monthly
Visual inspection
Operating staff
Check side scraper,
adjust or replace if re-
quired.
Monthly
Visual inspection
Operating staff
Check
chains
for
wear, replace if re-
quired.
Monthly
Visual inspection
Operating staff
Check sprockets for
wear, replace if re-
quired.
Monthly
Visual inspection
Operating staff
Check infeed rollers
for wear, replace if re-
quired.
Monthly
Visual inspection
Operating staff
Check electrical con-
nections for tight-
ness, tighten if re-
quired.
Before initial com-
missioning,
then
annually.
Specific tools
Electrician (E)
Inspection of the en-
tire plant
Annually
%
Installer Schwarz
Содержание SB10B
Страница 48: ...48 8 Spare parts and circuit diagrams Figure 8 2 Overview spare parts page 2...
Страница 49: ...8 1 Overview drawings 49 Figure 8 3 Overview spare parts page 3...
Страница 50: ...50 8 Spare parts and circuit diagrams Figure 8 4 Overview spare parts page 4...
Страница 51: ...8 1 Overview drawings 51 Figure 8 5 Overview spare parts page 5...
Страница 52: ...52 8 Spare parts and circuit diagrams Figure 8 6 Overview spare parts page 6...
Страница 53: ...8 1 Overview drawings 53 Figure 8 7 Overview spare parts page 7...
Страница 88: ......
Страница 90: ...90 10 EC declaration of conformity...
Страница 91: ...10 1 EC declaration of conformity 91 11 Annex third party documentation See supplements...
Страница 95: ...12 1 Notes 95...
Страница 96: ...96 12 Notes...