
4.7 Commissioning
19
4.7 Commissioning
Preparation:
Suitable power supply to the machine must be ensured.
Switching on:
To switch the machine on, turn the main switch to the 1-ON position.
Now operate the EMERGENCY OFF RESET button at the control cabinet.
Then switch on the control of the system with the button control ON.
Pushing the symbol for automatic mode on the operating panel switches the system to
automatic mode.
Pushing and holding the ON symbol on the operating panel starts the system after an
acoustic start-up warning.
Safety inspection:
The machine is equipped with several EMERGENCY OFF devices.
When they are operated, the machine must stop.
The EMERGENCY OFF facilities are located:
On the control cabinets on the left and right sides of the machine
At the end of the roller tables.
Opening one of the four doors to the inside of the machine also trips a at the machine.
Содержание SB10B
Страница 48: ...48 8 Spare parts and circuit diagrams Figure 8 2 Overview spare parts page 2...
Страница 49: ...8 1 Overview drawings 49 Figure 8 3 Overview spare parts page 3...
Страница 50: ...50 8 Spare parts and circuit diagrams Figure 8 4 Overview spare parts page 4...
Страница 51: ...8 1 Overview drawings 51 Figure 8 5 Overview spare parts page 5...
Страница 52: ...52 8 Spare parts and circuit diagrams Figure 8 6 Overview spare parts page 6...
Страница 53: ...8 1 Overview drawings 53 Figure 8 7 Overview spare parts page 7...
Страница 88: ......
Страница 90: ...90 10 EC declaration of conformity...
Страница 91: ...10 1 EC declaration of conformity 91 11 Annex third party documentation See supplements...
Страница 95: ...12 1 Notes 95...
Страница 96: ...96 12 Notes...