background image

 

 

 

 

 

 

 

novoSchwank D 

Radiant Tube Heater 

 

20S U / 25S U / 35S U / 45S U / 55S U 

single heater and flue gas collection system [herringbone] type F 

 
 
 
 
 
 
 

 

Technical Manual 

Technical Instructions 

Operating Instructions 

Legal Requirements 

Assembly Instructions 

Installation Instructions 

Commissioning 

Service Guide 

0085BO0037 

Version 013  nov

o

 shape U I

N

T  38/

19

 

Te

c

hnic

a

l sp
ec
ific

at

io

n sub

je

c

t to
 

h

 

Содержание novoSchwank D 20S U

Страница 1: ...ue gas collection system herringbone type F Technical Manual Technical Instructions Operating Instructions Legal Requirements Assembly Instructions Installation Instructions Commissioning Service Guid...

Страница 2: ...gne Germany Tel 49 0 221 7176 0 Fax 49 0 221 7176 288 Internet www schwank de Schwank companies in Austria Belgium Canada China Czech Republic France Germany Great Britain Hungary Netherlands Poland R...

Страница 3: ...Electrical connection Operation without MODBUS control 30 Electrical connection Operation with MODBUS control 31 Electrical connection exhaust gas collecting system herringbone system 31 11 Commissio...

Страница 4: ...andling of the heater Notes for your safety This appliance is designed according to the requirements of the existing standards Nevertheless it is possible that dangers for you and others result from t...

Страница 5: ...bled Radiant tubes with turnaround box flange packing Corrosion resistant and radiant optimized reflector end cap and brackets for hanging Accessories Central control unit SchwankControl Touch with te...

Страница 6: ...e not shown 4 Fan 5 Air baffle plate only 20S U 25S U 35S U 55S U 6 Gas combination valve 1 stage 7 Test nipple connection pressure 8 Test nipple nozzle pressure 9 Adjustment screw nozzle pressure 10...

Страница 7: ...fety distance inside radiation area b Minimum upper safety distance when hanging horizontally c Minimum upper safety distance when hanging angled d Minimum lateral distance to supply pipes outside rad...

Страница 8: ...s several centimetres because of thermal expansion Avoid therefore inflexible suspension Do not use fixing elements like open hooks etc Hang the heater in balance We recommend the use of turnbuckles o...

Страница 9: ...system combustion air from inside the room 2 Flued with individual exhaust system combustion air from inside the room Type B23 3 Flued with individual exhaust system combustion air from outside the r...

Страница 10: ...ollecting system and central flue fan according to EN 777 Type F The heating installation must not exceed 10 radiant tubes The exhaust air of each tube is collected via a central collecting tube syste...

Страница 11: ...indirect flue into the room a flue gas diverter must be installed to prevent backflow of flue gas into the air inlet Note that the flue gas diverter is mounted in a position so that the flue gas is d...

Страница 12: ...ilding wall with screws by means of the integrated flange plate The flange plate supports and secures the wall terminal Please note the safety distance to flammable materials single wall exhaust pipe...

Страница 13: ...uilding ceiling The flange plate supports and secures the roof terminal Following components are required for mounting the roof terminal stainless steel version Distance heater terminal approx 1 5 m S...

Страница 14: ...e collecting system consists of following main components Tube heater novoSchwank Spiral duct and connection elements for exhaust collecting system different dimensions Central low pressure fan Fan mo...

Страница 15: ...force at the time of installation is a requirement of our warranty In Germany the following rules standards and regulations must be observed EnEV Verordnung ber energiesparenden W rmeschutz und energ...

Страница 16: ...f automatically Fault If no flame is reported during the pre purge period and the safety time approx 30 sec the heater repeats the ignition process If there is no flame after the second ignition proce...

Страница 17: ...xible with maximal wire cross section 3x 1 5 mm2 lflex or silicone cable To set the burner kit free of voltage it is only necessary to remove the plug of the power supply Regulation The heating system...

Страница 18: ...novoSchwank shape U 18 Version 013 novo shape U 38 19 INT Technical specification subject to change Fig 13 Measurements novoSchwank 45S U 55S U view from below novoSchwank 45S U novoSchwank 55S U...

Страница 19: ...ition and ionisation control Tab 4 Technical data novoSchwank 1 Hi n 9 97 kWh m3 2 Hi n 8 57 kWh m3 3 Hi n 12 87 kWh kg Tab 5 Function parts burner kit novoSchwank 1 Hi n 9 97 kWh m3 2 Hi n 8 57 kWh m...

Страница 20: ...system Fault If no flame is reported during the pre purge period including 1 repetition of ignition process the burner control unit IC 4000 1 will switch off the radiant tube error will give fan runs...

Страница 21: ...the reflector will be fixed on the turnaround box connection by 2x M 5 screws and self locking nuts The other reflector ending will be shoved under the clip of the suspension brackets Reflector and fr...

Страница 22: ...by 2x M 5 screws and self locking nuts The other reflector endings will be shoved under the clip of the suspension brackets Reflectors will be jointly fixed by 3x M 5 screws and self locking nuts Ref...

Страница 23: ...fix it by rivet Mount the second tube and fix the sleeve by the rivet as well Fix the rivets always in the opposite position lateral to the tube Use only stainless rivets First the reflector will be...

Страница 24: ...mounting the heater at the turnaround box connection Tube bars have to be fixed by nuts lock washers 3D washers M8 on the suspension bracket First the reflector will be fixed on the turnaround box co...

Страница 25: ...and 21 Remove the measuring pipe differential pressure contact between venturi fan and APS Now fit two new measuring pipes between venturi fan 2 2 way valve APS contact Making sure that the measuring...

Страница 26: ...novoSchwank shape U 26 Version 013 novo shape U 38 19_INT Technical specification subject to change Fig 22 View burner kit after conversion Fig 23 Assembly connection parts exhaust gas...

Страница 27: ...imum connection pressure in front of the gas combination valve of the individual devices is available at the nominal thermal load of the entire system according to Tab 6 Please consider the pressure d...

Страница 28: ...f the heater Reconnection after pressure control and expansion Please observe the national standards Connect the heater with an approved flexible hose Use the following hose length for infraSchwank D...

Страница 29: ...be mounted at the end of the tube heater The adapter must be fixed with a gasket at the flange of the last radiant tube The spiral tubes for the flue collecting system with different lengths and dime...

Страница 30: ...on and combustion heat Only use heat resistant cables near the tubes The power supply for the heater must be flexible connected with lflex or silicone cable Electrical connection Operation without MOD...

Страница 31: ...on box MODBUS and connection burner control unit IC 4000 1 may be 0 5 m At the of each MODBUS communication circuit a terminal resistance 120 must be set on the relevant burner control unit IC 4000 1...

Страница 32: ...novoSchwank shape U 32 Version 013 novo shape U 38 19_INT Technical specification subject to change Fig 30 Wiring scheme burner kit novoSchwank with MODBUS control to SchwankControl Touch...

Страница 33: ...oSchwank shape U 33 Version 013 novo shape U 38 19_INT Technical specification subject to change Fig 31 Wiring scheme burner kit novoSchwank via relay control SchwankControl Touch without MODBUS contr...

Страница 34: ...pe U 34 Version 013 novo shape U 38 19 INT Technical specification subject to change Fig 32 Wiring scheme burner kit novoSchwank exhaust gas collecting system with SchwankControl Touch extension kit F...

Страница 35: ...e U 35 Version 013 novo shape U 38 19_INT Technical specification subject to change Fig 33 Wiring scheme burner kit novoSchwank 1 stage with alternative control kit SRT 1 Fig 34 Wiring diagram burner...

Страница 36: ...d in this service The heaters are only pre set by the manufacturer and must be adjusted for proper operation according to gas quality site on site For this information contact your local gas company C...

Страница 37: ...the two push buttons SW 2 and SW 3 and the 7 segment display For this unscrew the lid of the IC 4000 1 burner control After power supply IC 4000 1 following sequence is shown on the 7 segment display...

Страница 38: ...meter menu is closed and DISP1 is blank again Parameter settings menu has 10 minutes timeout If you don t press any button for 10 minutes control exits from parameters menu automatically without savin...

Страница 39: ...as H Wo 14 85 kWh m3 and natural gas L Wo 12 15 kWh m3 is shown in Table 5 For natural gas with other Wo Index information from local gas company you have to determine the required nozzle pressure bas...

Страница 40: ...novoSchwank shape U 40 Version 013 novo shape U 38 19_INT Technical specification subject to change Fig 39 Board IC4000 1 with 7 segment display and push buttons SW 2 SW 3...

Страница 41: ...nd of the tubes completely open The minimum negative pressure under these conditions must be 1 hPa In case the negative pressure level is lower please check again the tightness of the complete system...

Страница 42: ...42 Version 013 novo shape U 38 19_INT Technical specification subject to change Determination of nozzle pressure Example for the determination of the nozzle pressure Diagram 2 Wobbe Index profile Natu...

Страница 43: ...ion of the reflectors Check tightness of gas carrying parts and connections Check the flexible gas hose for correct installation and tightness Check electrical connection to the burner kit Check the a...

Страница 44: ...t detected for the 2 ignition attempts after a flame loss 3 APS open error APS air pressure switch Error Is given if phase angle control type is selected PP02 0 Error is given if APS contact opens dur...

Страница 45: ...lectrodes damaged dirty wrong setting gas throttling screw poor grounding Error code 2 poor low ionization current 0 7 A DC too low connection pressure Error code 7 8 internal error IC 4000 1 Error co...

Страница 46: ...ly 20S U 25S U 35S U Burner cup Burner nozzle Air baffle plate only 20S U 25S U 35S U 55S U Fan air restrictor Instruction to change the gas family 1 Change the burner nozzle 2 Change the burner ceram...

Страница 47: ...tion Fig 41 2 Fix end bracket at inner side of turnaround box open and close again 4 nuts M8 Fig 43 3 Fix two angled brackets at each tube hanger screws M8 x 60 nuts Fig 44 Screw on angled brackets at...

Страница 48: ...llation on site for flue system and may be gas line Connect flue system pipes and gas line NOTE Select the cut outs large enough to compensate the thermal length expansion of the heater 11 Insert fron...

Страница 49: ...al specification subject to change Fig 43 Fixed end bracket on turnaround box Fig 44 Fixed angled bracket on suspension bracket Fig 45 Holding bracket novoSchwank U Fig 46 Loose mounted clamp Fig 47 F...

Страница 50: ...page 21 24 2 Mount bolts with spacer sleeves and mounting brackets A at required positions Fig 48 3 If required fasten mounting bracket B to turn around box by losing 4 lower hex nuts M8 placing mount...

Страница 51: ...dle screw through angled bracket 5 Further assembling as described in chapter 9 page 21 24 Fig 51 52 Assembling order reflector elongation Gas filter groups To avoid technical problems with the gas co...

Страница 52: ...ner kit Union fitting first tighten by hand Access to the burner kit for assembling is given via the inspection opening on the top of the cover 4 Stick gasket on protection box with silicon Mount comp...

Страница 53: ...9151 1 2 Radiant tube L 3050mm novoSchwank 126 7020 0 3 Radiant tube L 4540mm novoSchwank not in Fig 57 126 4722 0 4 Radiant tube L 5950mm novoSchwank not in Fig 57 126 7199 0 5 Gasket between tubes...

Страница 54: ...17 8 5 Spare part gas valve cpl premounted replacement HONEYWELL for SIT novoSchwank 1 stage with cable valve in cardboard 126 7532 1 6 Spare part HONEYWELL for HONEYWELL 1 stage modulating VK 4105N 5...

Страница 55: ...novoSchwank shape U 55 Version 013 novo shape U 38 19_INT Technical specification subject to change 16 EC type examination certificate...

Страница 56: ...novoSchwank shape U 56 Version 013 novo shape U 38 19_INT Technical specification subject to change...

Страница 57: ...novoSchwank shape U 57 Version 013 novo shape U 38 19_INT Technical specification subject to change 17 EC declaration of conformity...

Отзывы: