
Commissioning and maintenance
02.00|0889073_ROTA TB-TBS-EP |en
49
Maintenance
A WEH-type maintenance unit, consisting of a filter, a water
separator and an oiler, must be connected upstream of the power
chuck. The oil-enriched air provides all the sliding parts of the
cylinder chamber with a film of oil. The oil level in the oil tank
must be checked daily, and oil must be added if necessary. If the
oil consumption is too low, i.e. if the oil level does not visibly drop
over a period of 2 to 3 days, the oil adjustment screw must be
opened slightly. Depending on how much condensation is
accumulated, the condensation drain screw should be opened
occasionally.
2-part maintenance unit, WEH-type, with filter, oiler, and
pressure control valve
Type
WEH-1
ID number
0890021
Technical Data
Oil type
Shell Tellus S2 MA 32
Esso Febis
Connection
G 1/4"
Nominal pressure
10 bar
9.2
Содержание ROTA EP 380-127
Страница 64: ...Assembly drawings 64 02 00 0889073_ROTA TB TBS EP en Assembly drawings TB 400 850 16 ...
Страница 65: ...Assembly drawings 02 00 0889073_ROTA TB TBS EP en 65 TB 400 850 LH Item for TB 400 115 and TB 400 140 ...
Страница 66: ...Assembly drawings 66 02 00 0889073_ROTA TB TBS EP en TB 400 850 LH ...
Страница 67: ...Assembly drawings 02 00 0889073_ROTA TB TBS EP en 67 X Clamping stroke TB 1000 LH ...
Страница 68: ...Assembly drawings 68 02 00 0889073_ROTA TB TBS EP en ...
Страница 69: ...Assembly drawings 02 00 0889073_ROTA TB TBS EP en 69 EP LH ...
Страница 70: ...Assembly drawings 70 02 00 0889073_ROTA TB TBS EP en ...