Assembly and initial operation
01.03/LPE/en
17
6.2
Connection of the motors
GEFAHR
Danger of electrical potential!
Switch off power supply before assembly, adjustment and
maintenance, and secure against restart.
The electrical installation may be performed only by a trained
electrician.
Cover live parts.
Detect absence of voltage, ground and short-circuit.
The unit can be selected with the motors provided by SCHUNIK
and their mechanical connection, or without motors, flanges and
couplings.
Information on connection of the motors contains the Project
Planning Manual MSK, Appendix 3, Chapter 8.
6.3
Connection of the Sensors
WARNING
Risk of injury when the machine/system moves
unexpectedly!
Switch off power supply.
Make sure that there is no more residual energy in the
system.
WARNING
Risk of injury due to electrical energy!
Switch off power supply.
Information on connection und handling of sensors contains:
•
Maintenance manual Beta 60-80-SRS-SSS (Appendix 1)
•
Maintenance manual Beta 100-140 ZRS-ZSS (Appendix 1)