INSTALLATION AND LOCATION

OPERATION

1. Installation:

2. Electrical connection:

Install the compressor in a covered, well

ventilated area, free of dust, toxic gases, humidity or any

other kind of pollution. The compressor should be located no

closer than 32" (800mm) from a wall or any other obstacle

that could interfere with the air flow through the fan. This

distance will also make maintenance easier. Place the

compressor on a leveled surface. Rotation of the flywheel

must be in the direction of the arrow cast into the flywheel.

The maximum ambient temperature recommended while

working is 104ºF or 40ºC. If necessary, install an exhaust fan

to guarantee fresh air and to dissipate heat.

Before making the electrical connections, check oil level and

top-up lubricating oil. For type of oil, see table at the end of

these instructions.

The country's valid electrical

standards must be followed regarding Low Voltage Electrical

Installation.

Before turning on the compressor,

check the crankcase oil level. It must be in the middle of the

OIL LEVEL SIGHT. As to the type of oil to be used and the

recommended change intervals, check at "Lubrication" and

as to its volume, check the Technical Data Table.

Turn on the electrical start key and let your

compressor run for about 10 (ten) minutes, what will keep

the tank's internal pressure or compressed air around 20

psig. This will optimize a homogeneous lubrication of the

parts.

1. Initial start procedure:

2. Start:

DIMENSIONS

DIMENSIONS

INSTALLATION AND OPERATION INSTRUCTIONS

INSTALLATION AND OPERATION INSTRUCTIONS

MAINTENANCE
WARNING

DAILY

WEEKLY

MONTHLY

QUARTERLY

ANNUALLY

LUBRICATION

NOTE:

RECOMMENDED LUBRICANT OILS FOR SCHULZ AIR PUMPS

-
-

-
-

-
-

-
- ASME s

-

-
-

-

-

-

-

Turn off power before servicing and be sure the air tank is unloaded. These

instructions are based on normal operating conditions. If the compressor is

located in an exceedingly dusty area, increase the frequency of all

inspections.

Inspect the compressor visually.
Check oil level and add some if necessary, before turning the

compressor on.
Drain moisture from the piping system.
Be sure there is no excessive or unusual vibration or noise.

Remove and clean intake air filters; do not wash the filter element.
Check V-belts for tightness. Belt tension should be adjusted to allow

approximately 3/8" to 1/2" (9 to 13 mm) deflection with normal thumb

pressure.
Clean cylinders externally, cylinder head, motor, fan blade, tubing, and tank.

afety valve should be tested manually to see if it is working properly.

Check entire system for air leakage around fittings, etc by using water and

soap lather.
Check the pressure switch operation.
Check for oil contamination and change it if necessary.

Change the air filter element every 300 working hours or quarterly.

(Whichever occurs first).
Fasten bolts and nuts as required. (See Table 1)

- Change oil more frequently if compressor is located in a very dirty

environment.

Test and calibrate the pressure switch, pressure gauge, pilot valve,

discharge valve and ASME safety valve according to their own technical

standards. These parts must be removed from the tank and pump to be

tested.
Inspect and clean the suction and discharge valve(s) plate(s) every 1000 (one

thousand) working hours (whichever occurs first), located between the

cylinder and its cover and, if necessary, replace it (them) according to the

operation conditions.

- The first oil change should be made after 8 hours of operation.
- The second oil change after 40 hours of operation.
- The third and following exchanges should be made after 200 hours of

operation, or 60 (sixty) days, whichever occurs first.

Heavy Duty and multi-viscous oils are not adequate for Schulz air

compressor's lubrication. The same applies to oils that tend to emulsify.
We recommend good industrial oil for air compressors, with rust and

oxidation inhibitors and high viscosity level (from 90 to 95), SAE or ISO, as

indicated in the table below:

- WHILE RUNNING IN A PERIOD OF ABOUT 100 WORKING HOURS THE OIL

LEVEL SHOULD BE CAREFULLY CHECKED.

DISTRIBUTOR

Below 32 F

Below 0 C

0

0

32 F to 68 F

0 C to 20 C

0

0

0

0

68 F to 104 F

20 C to 40 C

0

0

0

0

SAE 10W

or

ISO 32

SAE 20W

or

ISO 68

SAE 30

or

ISO 100

AMBIENT TEMPERATURE F ( C)

0

0

C

B

H

G

D

ØF

E

A

ISC Sales 
isccompressedair.com 
877-602-0010 
972-964-2700

Отзывы: