
OPERATION
SRW1400 08/16
Operation Section 4-32
© 2016 Alamo Group Inc.
OPERA
T
ION
15.1 Transport to Working Position
Before putting the rock windrower into transport position, be sure that the drum is locked
into transport position. Refer to the transportation section of this manual for complete drum
lock up instructions.
•
Lower transport wheel.
•
Secure the transport wheel lock pin with the
transport hole.
NOTE:
The interlock rotator prevents the hitch pole
from sliding out of the working cradle until the
transport wheel has been lowered.
15. TRANSPORTING THE TRACTOR AND IMPLEMENT
Inherent hazards of operating the tractor and implement and the possibility of accidents are not left behind
when you finish working in an area. Therefore, the operator must employ good judgement and safe operation
practices when transporting the tractor and implement between locations. By using good judgement and
following safe transport procedures, the possibility of accidents while moving between locations can be
substantially minimized.
OPS-U- 0017
A
-Transport cradle
B
-Working cradle
C
-Wheel lock pins
D
-Gearbox output driveline
Содержание SRW1400
Страница 4: ......
Страница 7: ...Safety Section 1 1 2016 Alamo Group Inc SAFETY SECTION ...
Страница 21: ...SAFETY SRW1400 08 16 Safety Section 1 15 2016 Alamo Group Inc SAFETY Decal Description ...
Страница 22: ...SAFETY SRW1400 08 16 Safety Section 1 16 2016 Alamo Group Inc SAFETY ...
Страница 23: ...SAFETY SRW1400 08 16 Safety Section 1 17 2016 Alamo Group Inc SAFETY ...
Страница 24: ...SAFETY SRW1400 08 16 Safety Section 1 18 2016 Alamo Group Inc SAFETY ...
Страница 26: ......
Страница 27: ...Introduction Section 2 1 2016 Alamo Group Inc INTRODUCTION SECTION ...
Страница 30: ......
Страница 31: ...Assembly Section 3 1 2016 Alamo Group Inc ASSEMBLY SECTION ...
Страница 38: ......
Страница 39: ...Operation Section 4 1 2016 Alamo Group Inc OPERATION SECTION ...
Страница 79: ...Maintenance Section 5 1 2016 Alamo Group Inc MAINTENANCE SECTION ...
Страница 90: ...SRW1400 08 16 P N R200 010C Printed Canada ...