Schlosser KB55-EB75KS EU-SG 333 Скачать руководство пользователя страница 4

Schlosser 
Aufzugtechnologie GmbH
Felix-Wankel-Straße 4
85221 Dachau
T +49 8131 / 5186-0
www.schlosser.de

Ausgabe
edition

06.09.2018

Seiten
pages

4/7

Bearbeiter
person in charge

Kepplinger

Zeichnung Nr.
drawing nr.

5360.800.004

Combination KB55-EB75KS

Mounting / Adjustment / Check

C ( 0,20 : 1 )

B

C

Release lever (24)

Actuation tab (23)

Release bar (25)

Brake shoe (1)

Release slider (5)

Brake shoe (10)

Double eccentric (8)

ca.

1,0

0 - 

2,0

0m

m

min.0,50 - max.1,00mm

Actuation lever (22)

Actuation tab (23)

Release bar (25)

Release lever (24)

Brake shoe (10)

Double eccentric (8)

Spiel min.0,5 - max.1,0mm

je Seite im verbohrten

Auslösehebel

Verschraubung von

oben

Setting type: EB 75 KS - acting upwards
1.  Adjust the braking device and guide rail using the adjusting screw (M6) until a clearance of 1 - 2 mm between the brake shoe (10) and 

the rail is set, then lock.

2.  Mount the release bar (25) with lockwasher on double eccentric (8) to the top borehole (thread M8) using the releasing bolt (M8)

B ( 0,30 : 1 )

C ( 0,30 : 1 )

Betätigungshebel (22)

Auslösehebel (24)

Betätigungslasche (23)

Auslöselasche (25)

Bremsbacke (1)

Auslöseschieber (5)

Bremsbacke (10)

Doppelexzenter (8)

0,5

Betätigungshebel (22)

Betätigungslasche (23)

Auslöselasche (25)

Auslösehebel (25)

Bremsbacke (10)

Doppelexzenter (8)

1,0 - 2,0mm

Adjusting screw M6

A ( 0,25 : 1 )

A

Lockwasher

Release bar (25)

Releasing bolt M8

Mounting / adjustment / check
1.  Setting type KB 55 to synchronous running  

Push up (engagement downwards) the actuation lever 

(22) until the brake shoes (1) clamp on the guide rail 
(press).

Check

:

The brake shoes (1) must clamp (press) in both safety gears. If 
not, the spindles (15) must be adjusted (some lead of the brake 
shoes (1) opposite the Actuation lever (22) is an advantage)!

2.  Check type EB 75 KS for synchronous running 

Press down (brake upwards) the actuating lever (22) 

until both double eccentrics (8) are pressed onto the guide 
rails.  
Check: If not: Change clearance 1-2 mm between brake 
shoe (10) and guide rail slightly by adjusting the adjusting 
screw (M6).

Note

: A test run provides clarity! Slow raising of the system (test 

run) with activation of the actuation lever (22) until the double 
eccentrics (8) turn in automatically. Stop the system immediately 
when the double eccentrics turn in!

Then check that both double eccentrics (8) have clamped. Lower 
the system to release! Both brake mechanisms must reset auto-
matically via the reset spring (29) and the kingpin (12)!
3.  Attachment of the release cable coupling (26) – „Long 

side“ up!

4.  Adjusting the reset clamping spring (18). Select the preten-

sion to ensure normal operation. Observe the pull-in forces 
of the release components, e.g. overspeed governor! (The 
pull-in force must be double that of the safety module at 
the overspeed governor!)

Brake shoe retainer

1-2mm

Actuation lever (22)

Actuation bar

Double eccenric (8)

Release lever

Brake shoe (1)

Brake pads

Brake shoe (10)

Adjusting screw M6

Releasing bolt M8

Actuating bar

Release wire (26)

Freewheel yoke (16)

Freewheel switcher (32)

Release slider (5)

Angle joint with spindle M10

Adjusting screw M8

Adjusting screw M8

Reset cam

Kingpin (12)

Spindle for adjusting (15)

Resetting spring (29)

Resetting bracket (18)

Front view

Back view

DOWN

UP

DOWN
UP

Содержание KB55-EB75KS EU-SG 333

Страница 1: ...he overspeed governor incl UCM A3 General instructions 5360 800 002 Mounting adjustment 5360 800 003 Mounting adjustment check 5360 800 004 Mounting information 5360 800 005 Check 5360 800 006 Test instructions information 5360 800 007 Kingpin can be pulled out Brake shoe retainer Brake shoe Brake pads Release slider Lockwash Double eccentric Kingpin can be pulled out Spring steel strip inside Rel...

Страница 2: ... kingpin 6 Important Prior to commissioning 1 Before commissioning and testing the guide rails must be cleaned thoroughly prior to installation Whether old or new due to dirt old lubricant or protective agents in case of new rails they must be kept clean both before and after commissioning 2 Should this not take place negative changes in the braking force etc can will occur In this case any potent...

Страница 3: ...ic 8 ca 1 00 2 00mm min 0 5 S je A Angle joint 14 Spindle for adjusting M10 15 Freewheel yoke 16 Reset cam 19 Reversing lever 17 opt double reset clamp High speed Adjustment Turn the thread M10 15 with the angle joint 14 until the length to the release slider 5 in adjusted in the open position both sides Safety gear KB 55 Adjustment of the set screws M8 a Press the release slider 5 up until the br...

Страница 4: ...s 1 opposite the Actuation lever 22 is an advantage 2 Check type EB 75 KS for synchronous running l Press down brake upwards the actuating lever 22 until both double eccentrics 8 are pressed onto the guide rails Check If not Change clearance 1 2 mm between brake shoe 10 and guide rail slightly by adjusting the adjusting screw M6 Note A test run provides clarity Slow raising of the system test run ...

Страница 5: ... the guide rail by loading activity or one sided loading of the lift This is because the later enlargement of the clearance is often not possible EB75KS EU SG 313 Date UCM NL12 400 1002 169 04 Rev 1 Serial No Tripping spd max m s Brake force 25490 29399N Guide head Aufzugtechnologie G Schlosser GmbH Felix Wankel Str 4 85221 Dachau Switching cam 21 Positioner sleeve Safety switch 27 Freewheel switc...

Страница 6: ...rmal operation of the lift If necessary brake shoes can be replaced Visual examination is considered sufficient The objective of the test prior to commissioning is to determine the proper as sembly the correct adjustment and the strength of the functional unit comprising the car safety gear guide rails rail mountings Tripping engagement forces At least double the required pull in force lk of the s...

Страница 7: ... Straße 4 85221 Dachau T 49 8131 5186 0 www schlosser de Ausgabe edition 06 09 2018 Seiten pages 7 7 Bearbeiter person in charge Kepplinger Zeichnung Nr drawing nr 5360 800 007 Note 1 In the case of weightless testing downwards electronic test device the bouncing of the cabin can cause the brake to fall back or be pulled into the upwards braking position Bouncing counterweight 2 Also a release fro...

Страница 8: ...5 EB75KS Schlosser Aufzugtechnologie GmbH Felix Wankel Straße 4 85221 Dachau T 49 8131 5186 0 www schlosser de Ausgabe edition 06 09 2018 Seiten pages 1 Bearbeiter person in charge Kepplinger Zeichnung Nr drawing nr 5360 800 010 Starting condition Final Detail release lever actuating bar Half nut M12 Half nut M12 Disk Rubber ring 6KT screw M12x40 Option high speed Alternativ detachable outer housi...

Отзывы: