0
SCHLETTER SOLAR GMBH Alustra
ss
e 1
83527 Kirchdorf GERMANY
www.schletter-group.com
We reserve the right to changes, including
techni cal modification.
Страница 1: ...RAPIDPRO MODULE CLAMP INSTALLATION GUIDE...
Страница 2: ...TER SOLAR GMBH SUBJECT TO CHANGES Table of contents RAPIDPRO MODULE CLAMP INSTALLATION GUIDE 3 TOOLS NEEDED 3 TIGHTENING TORQUE 3 SAFETY INSTRUCTIONS 3 VERTICAL INSTALLATION 4 1 PROFILE ARRANGEMENT 4...
Страница 3: ...all protec tion equipment PV mounting systems do not meet the existing normative requirements for climbing aids or fall protection measures They are therefore neither suitable as climbing aids nor as...
Страница 4: ...ng points as per the manufacturer s instructions 2 INSTALLING THE FIRST MODULE Place the module on the profile ends Align the module Click in 2 RapidPro end clamps and tighten the screws TX drive T40...
Страница 5: ...epeat steps until the last module of the sequence is installed Observe module distance see illustration Distance of the modules between the module rows at least 10 mm or in accordance with the install...
Страница 6: ...e proceed as follows When loosening the clamps pull the upper part of the clamp upwards together with the screw so that the clamp is loosened from the module frame and the screw does not unscrew from...
Страница 7: ...0 0 SCHLETTER SOLAR GMBH Alustrasse 1 83527 Kirchdorf GERMANY www schletter group com We reserve the right to changes including techni cal modification...