7
ASSEMBLY INSTRUCTIONS
Step 1
Snowblower Preparation:
Refer to parts breakdown section for parts identification
Remove the snowblower from the shipping crate.
Chute Installation:
NOTE:
This step requires two people.
1.Wrap the rotation ring (item 1) (groove inside)
around the edge of the discharge chute (item 2) as
shown.
2.Place the chute (item 3) (opening facing forward)
over the rotation ring.
IMPORTANT
: The ring must be inside the base of
the chute. It is the chute that will hold the rotation
ring in place.
3.On the right side of snowblower, install the
grooved rotation ring (item 4) under the chute as
shown.
4.Secure the chute and rotation ring in place with six
hex bolts 1/4’’ x 1 1/4’’ (item 5) and nuts as shown.
Do not tighten too firmly.
5.On the left side of the snowblower, install the other
half of rotation ring (item 6) under the chute as
shown.
6.Secure the chute and rotation ring in place with
three hex bolts 1/4’’ x 1 1/4’’ (item 7) and nuts (as
shown). Do not tighten the nuts too firmly.
(Nuts that are too tight might prevent the chute from
rotating side to side. Only a slight pressure is neces-
sary).
Содержание 75-71231
Страница 2: ...2 ...
Страница 18: ...16 PARTS SECTION PARTS SECTION ...
Страница 19: ...17 O L Obtain Locally ...
Страница 20: ...18 ...
Страница 21: ...19 O L Obtain Locally ...
Страница 22: ...20 O L Obtain Locally ...
Страница 23: ...21 O L Obtain Locally ...
Страница 24: ...22 O L Obtain Locally ...
Страница 25: ...23 O L Obtain Locally ...
Страница 26: ...24 ...
Страница 27: ...25 O L Obtain Locally ...