INSTALLATION
Page 6 of 6
FCR1 Installation Guide
3
Mark and cut top-most riser
Push cover ring onto riser body until it
stops (about 1").
Measure “X” with tape measure.
Remove cover ring from riser
assembly and mark “X” with
supplied grease pencil.
Cut “X” from top of riser and discard.
Ensure cover ring gasket is
positioned as shown.
Place riser on interceptor,
aligning bolt holes.
3a
3d
3e
3f
3b
3c
X
X
5
Prepare for backfill
Resume “Buried Installation” instructions for
applicable unit (GB1, GB2 or GB3)
4
Fasten riser to interceptor
Remove any burrs or debris
at the cut edge. Push cover
ring onto riser body until it
stops (about 1").
4a
Ensure cover ring gasket is
positioned as shown.
4b
Place riser on interceptor,
aligning bolt holes and fasten
securely with mounting bolts.
4c