background image

36%6

Cover

(included with

base unit)

Riser Kit

36%6

)LJXUH

Finished floor

Fasten cover

Install riser

)LJXUH

Remove cover

Install ring / bolts

Finished floor

 X" 

)LJXUH

Finished floor

Install

Riser

 X" 

)LJXUH

Riser

Mark, cut,

and deburr

Riser

Bolts

Gasketed Ring

655LVHU.LW

6ROG6HSDUDWHO\

 2-1/8" Min. 

)LJXUH

 16" Max. 

7RROVLQFOXGHGZLWKULVHUNLW

Silver permanent marker

7RROV1HHGHG

Tape measure

Phillips head screwdriver

Jigsaw or

Cordless circular saw or

Reciprocating saw

5LVHU$VVHPEO\,QVWUXFWLRQV6WHSV

If unit is to be buried, you will need a riser kit (sold separately). The 16 Series TeleGlide Riser System for these models 

1.

allows riser heights from 2-1/8" above standard unit up to 16". Only ONE riser may be used per base unit to allow sufficient 

access to internal serviecable components. See Figure 5.

If more than 16" of riser height is needed, you will need to adjust jobsite requirements OR purchase the next available 

2.

model with a 24 Series TeleGlide Riser System which allows taller riser heights.

Once unit is set so that pipe connections line up with jobsite piping, remove cover from unit. Fasten yellow gasketed ring to 

3.

unit with hardware provided in separate riser kit. Ring flange with 4 bolt notches faces down against the unit. See Figure 1.

Push riser into ring until it stops (about 1 inch). See Figure 2.

4.

Measure the distance from the top edge of the riser down to the finished floor. Make sure to account for any future tile work 

5.

in your measurment. See Figure 2.

Remove riser from ring. Take measurement from step 5 from the BOTTOM of the riser upwards towards the top of the 

6.

riser. Mark a line around the riser, and cut with handsaw, jig saw, or reciprocating saw. Remove debris from cut edge with 

scraper, utility knife, or gloves. See Figure 3.

Place cut riser back into ring on unit until it stops. Fasten cover from unit into riser with the same 4 bolts from the unit. Unit 

7.

is ready to be water tested and backfilled. Install finished floor. See Figure 4. 

127(6

Schier solids interceptors are not to be installed in any other manner except as shown.  Consult local 

codes for separate trapping requirements, cleanout locations and additional installation instructions.

7HOH*OLGH5LVHU6HULHV,QVWDOODWLRQ*XLGHOLQHV

36%636%6

Minimum and maximum riser heights when units are buried. 

Measure

Measurement

from Figure 2

'$7(

11/30/11

PS SERIES INSTALLATION, OPERATION 

AND MAINTENANCE GUIDE

6FKLHU3URGXFWV

:RRGHQG5G

(GZDUGVYLOOH.6

7HO

)D[

ZZZVFKLHUSURGXFWVFRP

0DGHLQWKH86$

'(6&5,37,21

':*%<

EAS

5(9

01

'2&80(17180%(5

057-0650-01

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

6&+,(5352'8&76

. ANY REPRODUCTION IN 

PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF 

6&+,(5352'8&76

IS PROHIBITED.

35235,(7$5<$1'&21),'(17,$/

6+((7180%(5

6 of 6

(&2

1003

Содержание PROSPECTOR Series

Страница 1: ...eplace or supply credit to the original purchaser This warranty does not cover damage caused by the Products normal usage or wear and tear nor does it cover damage from naturally occurring phenomenon including but not limited to UV freeze related damage or natural disasters This warranty does not cover the purchaser s cost of routine maintenance including replacement of parts required in routine m...

Страница 2: ...aced 4 Clean main body of the interceptor Make sure to remove water and fine debris that may have accumulated 5 Replace basket or screen in proper locations 6 Fill unit with water 7 Replace cover s Inspect gasket on underside of cover for wear and tear 8 Properly dispose of collected material 3803 1 5 48 1 Frequency depends on the capacity of the separator and the amount of debris in the wastewate...

Страница 3: ...ced 1 Width and length of excavation shall be minimum 12 greater 2 than the tank on all sides Depth of excavation shall be 6 deeper than tank bottom 3 Set the tank in well packed crushed aggregate material 4 approximately 3 4 size rock or sand with no fines Anchor kit is recommended for installations in high water table conditions to 5 prevent float out To be determined by specifying engineer If n...

Страница 4: ...7 backfill material approximately 3 4 size rock or sand 2 with no fines 3 Place 6 aggregate base under slab 211 7 216 Connect waste piping to the unit 1 17 5 25 29 5 167 7 21 16758 7 216 36 6 5 6 If concrete slab falls within body of unit reinforce with rebar extending 6 beyond footprint of unit to connect main floor slab When the jobsite requires burying unit flush with floor without using a rise...

Страница 5: ...ve been DO NOT cut this new line Once the riser is installed into the main unit this new line will end up at the top of the gasket and will aid in re assembly See Figure 3 IMPORTANT Before the next step 8 Make sure both diffusers are installed inside the main unit at the appropriate locations 1 and check if there needs to be any flow control adjustment on the inlet diffuser Refer to sheet 2 of the...

Страница 6: ...ntil it stops about 1 inch See Figure 2 4 Measure the distance from the top edge of the riser down to the finished floor Make sure to account for any future tile work 5 in your measurment See Figure 2 Remove riser from ring Take measurement from step 5 from the BOTTOM of the riser upwards towards the top of the 6 riser Mark a line around the riser and cut with handsaw jig saw or reciprocating saw ...

Отзывы: