Schier Products PROSPECTOR Series Скачать руководство пользователя страница 2

Connect inlet and outlet drainage lines to 

unit.  Mechanically couple pipes to

unit. 

'RQRWVROYHQWZHOG

.  

Top View

Top View

(Inside Unit)

FLOW

Flow

Fill with water

PS-275-B Shown

PS-275-B Shown

Removable filter

basket

Outlet

Inlet

FLOW

Isometric View

Set unit on level solid surface as close as

possible to fixtures being served.  If unit is 

to be installed below grade refer to below 

grade installation instructions. (sheet #3)

127(6

Schier solids interceptors are not to be installed in any other manner except as shown.  Consult local 

codes for separate trapping requirements, cleanout locations and additional installation instructions.

23(5$7,21

The prospector Series (PS-Series) solids interceptors are designed to capture

heavy and suspended solids from in-line drainage applications before entering

the public sewer or private septic system. This is done by means of a removable

perforated basket or a removable perforated screen.

0$,17(1$1&(

Remove cover(s).

1.

  

Remove basket (for "-B" models) and empty contents into receptacle.

2.

Remove screen (for "-S" models) and discard any material captured by the

3.

screen. Note the placement of filters so they will be properly replaced.

4.  Clean main body of the interceptor. Make sure to remove water and fine

debris that may have accumulated.

5.  Replace basket or screen in proper locations.

 

6.  Fill unit with water.

7.  Replace cover(s). Inspect gasket on underside of cover for wear and tear.

8.  Properly dispose of collected material.

3803,1*)5(48(1&<

Frequency depends on the capacity of the separator and the amount of debris

in the wastewater.

After initial installation, it is recommended that the basket or screen is inspected 

every 3 to 4 weeks. A proper maintenance schedule can be determined based off

inspections.

7528%/(6+227,1*7,36

Slower than usual drainage may indicate the need to clean solids interceptor.

Always take proper care to ensure a safe and healthy environment while 

cleaning interceptor.  For best cleaning and maintenance service, call your 

local sewer and drain contractor.

*(1(5$/,17(5&(3725,167$//$7,21,16758&7,216

36%6+2:1

To test unit and TeleGlide riser system for leaks, cap/plug unused connections and 

fill unit with water to covers.  Inspect gaskets, fittings, and unit for any leaks.

If no leaks are detected drain water to the static waterline. Unit is now ready to be 

backfilled and put into operation. 

'$7(

11/30/11

5(9

01

PS SERIES INSTALLATION, OPERATION 

AND MAINTENANCE GUIDE

6FKLHU3URGXFWV

:RRGHQG5G

(GZDUGVYLOOH.6

7HO

)D[

ZZZVFKLHUSURGXFWVFRP

0DGHLQWKH86$

'(6&5,37,21

':*%<

EAS

6+((7180%(5

2 of 6

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

6&+,(5352'8&76

. ANY REPRODUCTION IN 

PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF 

6&+,(5352'8&76

IS PROHIBITED.

35235,(7$5<$1'&21),'(17,$/

(&2

1003

'2&80(17180%(5

057-0650-01

Содержание PROSPECTOR Series

Страница 1: ...eplace or supply credit to the original purchaser This warranty does not cover damage caused by the Products normal usage or wear and tear nor does it cover damage from naturally occurring phenomenon including but not limited to UV freeze related damage or natural disasters This warranty does not cover the purchaser s cost of routine maintenance including replacement of parts required in routine m...

Страница 2: ...aced 4 Clean main body of the interceptor Make sure to remove water and fine debris that may have accumulated 5 Replace basket or screen in proper locations 6 Fill unit with water 7 Replace cover s Inspect gasket on underside of cover for wear and tear 8 Properly dispose of collected material 3803 1 5 48 1 Frequency depends on the capacity of the separator and the amount of debris in the wastewate...

Страница 3: ...ced 1 Width and length of excavation shall be minimum 12 greater 2 than the tank on all sides Depth of excavation shall be 6 deeper than tank bottom 3 Set the tank in well packed crushed aggregate material 4 approximately 3 4 size rock or sand with no fines Anchor kit is recommended for installations in high water table conditions to 5 prevent float out To be determined by specifying engineer If n...

Страница 4: ...7 backfill material approximately 3 4 size rock or sand 2 with no fines 3 Place 6 aggregate base under slab 211 7 216 Connect waste piping to the unit 1 17 5 25 29 5 167 7 21 16758 7 216 36 6 5 6 If concrete slab falls within body of unit reinforce with rebar extending 6 beyond footprint of unit to connect main floor slab When the jobsite requires burying unit flush with floor without using a rise...

Страница 5: ...ve been DO NOT cut this new line Once the riser is installed into the main unit this new line will end up at the top of the gasket and will aid in re assembly See Figure 3 IMPORTANT Before the next step 8 Make sure both diffusers are installed inside the main unit at the appropriate locations 1 and check if there needs to be any flow control adjustment on the inlet diffuser Refer to sheet 2 of the...

Страница 6: ...ntil it stops about 1 inch See Figure 2 4 Measure the distance from the top edge of the riser down to the finished floor Make sure to account for any future tile work 5 in your measurment See Figure 2 Remove riser from ring Take measurement from step 5 from the BOTTOM of the riser upwards towards the top of the 6 riser Mark a line around the riser and cut with handsaw jig saw or reciprocating saw ...

Отзывы: