background image

47

www.schaerer.com

BASI 2 - EN 

Version 04
08.2007

Operation

Operation

Introduction

This chapter describes the basic functions of the coffee machine. Observe these instructions in 

order to ensure smooth and safe daily operation.

Please observe the safety notes on page 40!

Correct and optimal operation of the coffee machine is required and ensured through proper 

installation and programming by a qualified service technician.

•  Never reach under the beverage outlet or the hot water outlet while a product is being dis-

pensed. The beverages dispensed from the device are hot!

•  Never direct the steam jet or hot water jet towards parts of the body!
•  Do not touch the hot plate for cups or the beverage outlet. Only touch the burn-proof fixture of 

the hot water outlet and the steam pipe.

•  The device does not stop if the carafe or cup is removed from the beverage dispensing area 

while a beverage is being dispensed.

If a liquid is accidentally poured over the hot plate for cups, the device must be switched off (risk 

of short-circuit). Please notify customer service immediately.

Filling coffee beans

Fill only roasted coffee beans into the container.

►  Remove the lid from the bean container.
►  Fill beans (Siena 1

: 300 g    

Siena 2: 600 g) into the bean container and fit the lid back on.

A well-sealed bean container prevents the loss of aroma.

Making the coffee machine ready to operate

Please check the following before switching on the machine:

►  Fresh water supply is open (with fixed water supply option only).
►  The bean containers are filled (see above).
►  The grounds container is empty.
►  The machine is connected to the mains.

Switching on the coffee machine

►  Flip the main power switch to „ON

“ (refer to the picture). 

►  Now press the 

 button.

    

    

Ready

As soon as the display message 

shown here appears, the machine is 

ready to operate..

Содержание Siena 1/2

Страница 1: ...ungsanleitung Seite 2 User manual Page 35 Manuel d utilisation Page 69 Gebruiksaanwijzing Pagina 103 Manual del usuario P gina 137 N vod k obsluze Strana 171 Haszn lati tmutat Oldalt 205 V04 08 2007 S...

Страница 2: ...ign languages This document or any excerpts thereof may not be copied repro duced distributed or electronically transmitted in any form regardless of the process used without first obtaining written c...

Страница 3: ...up plate Control panel see below Display Grounds container Foamer head refer to page 43 Siena 1 Beverage outlet Drip tray Drip grid Insert for coffee powder cleaning tablet Service door 2 parts Siena...

Страница 4: ...gh quality Swiss product which was specially designed for professional household use or catering businesses This manual provides you with detailed information about how to commission program operate a...

Страница 5: ...e 48 Preparing DECAF coffee coffee powder 48 Preparing hot water Siena 1 48 Preparing hot water Siena 2 49 Preparing steam Siena 1 49 Preparing cappuccino Siena 2 49 Preparing milk foam Siena 1 49 Pre...

Страница 6: ...orts Art No 062489 64 Fixed water supply 64 Appendix 64 Declaration of conformity 64 Cleaning products 65 IBEDA cleaning tablet Art No 062867 65 Milkpure cleaning product Art No 071531 65 Liquid desca...

Страница 7: ...ty supply pipe Should an additional supply pipe be re quired as an extension it must also be in awless condition and attached in such a way that no one can trip over the supply pipe Keep the supply pi...

Страница 8: ...lk In any case the milk must be homog enised Only use pre refrigerated milk with a maximum temperature of 5 C If the milk is at a tempera ture of over 5 C an optimum product cannot be dispensed We rec...

Страница 9: ...ator cooling element optional at least once a week if the machine is equipped with one Improper use of the device Improper installation commissioning operation and maintenance of the device and the as...

Страница 10: ...no milk foam is dispensed insert the supplied instrument air valve pin into the foam nozzle 3 Refer to the detailed picture on the left The display symbols Water volume indicator Language indicator C...

Страница 11: ...ure tube and the G 1 4 screw at the pressure relief component mounted to the tap set to 2 bar If the machine is attached to a water drainage system the supplied tem peratureresistant drain hose must b...

Страница 12: ...45 www schaerer com BASI 2 EN Version 04 08 2007 Product description Installation plan for Siena 2...

Страница 13: ...provided with the machine Pull the connector cable on the rear of the device out to the required length and connect the device to a grounded socket Never insert the power plug into the socket if it is...

Страница 14: ...stop if the carafe or cup is removed from the beverage dispensing area while a beverage is being dispensed If a liquid is accidentally poured over the hot plate for cups the device must be switched o...

Страница 15: ...utton Preparing DECAF coffee coffee powder Do not use any water soluble freeze dried or similar products Use only pure ground coffee Fill no more than 1 2 level measuring spoons into the coffee hopper...

Страница 16: ...milk nozzle downwards into the milk container refer to the pic ture Place a cup under the outlet Touch the cappuccino button The product is dispensed Remove the cup from under the outlet To prepare ma...

Страница 17: ...foam Milk foam too cold fit a smaller diameter milk nozzle Milk foam too hot fit a larger diameter milk nozzle Pre heating cups This is recommended for smaller quantities of coffee espresso In additio...

Страница 18: ...el can only be carried out with a PIN code The following instructions assume that the machine is ready to operate Navigation through the programming level Access to programming level Confirm parameter...

Страница 19: ...time using or Confirm by pressing Pre brewing ON Switch pre brewing on or off using or Confirm by pressing Ready End of product programming Siena 2 Press button 3 seepage 52 0 Set the water volume ml...

Страница 20: ...eady Press to access the programming level Product 2x C Siena 2 Product programming milk foam Press button 4 0 s Set the milk foam volume sec using or Confirm by pressing Ready End of milk foam progra...

Страница 21: ...6 C Set the brewing temperature using or Confirm by pressing Stand by 1 h Set the automatic switch off time using or Confirm by pressing 41318585111 Service telephone number Confirm by pressing Ex sof...

Страница 22: ...Grant authorisation for system programming using or Confirm by pressing Counter ON Switch the counter display of the product buttons on or off using or Confirm by pressing 16 20 dH Set water hardness...

Страница 23: ...lgende Reinigungsm glichkeiten sind m glich also see Daily and weekly cleaning page 57 Cleaning mode Cleaning for Press button Information Complete cleaning Coffee system Brew piston Milk system 3 x b...

Страница 24: ...s finished Carefully read the information given in the user manual as it contains important information regarding safety hygiene use and maintenance of the machine Never reach into the machine or unde...

Страница 25: ...rewer Clean the brewer under warm running water Remove and clean the plastic tray Remove the coffee grounds in the brew er area using a vacuum cleaner or the brush Re place the plastic tray and the br...

Страница 26: ...ator blinks top up with water and re insert the tank The descal ing process will start automatically Re place the water tank Descaler Water 1 x 750 ml 2 x 750 ml Dosierung Siena 2 Place a container un...

Страница 27: ...r Swing the foam chamber with outlet pipe away from the outlet beaker 3 Remove the foam chamber by pulling it upwards 4 Unscrew and remove the outlet pipe 5 Clean all parts under running water Re atta...

Страница 28: ...o page 43 Does the milk foam have large bubbles Siena 2 Milch ist zu warm Milch immer im K hlschrank aufThe milk is too warm always keep milk in the refrigerator Opti mal milk temperature 3 C to 5 C T...

Страница 29: ...uct life cycle Service request The service request only appears if it has been programmed by one of our partners or a qualified service technician Once it is time to service the machine the message Se...

Страница 30: ...fied service technician If the coffee machine is switched off the coins are ejected through the return slot If a coin is not accepted it can be ejected by pressing the release button 1 refer to the pi...

Страница 31: ...5 7 dH 8 12 fH carbonate hardnes Fixed water supply structural requirements FMinimal basic structural conditions are required for the fixed water supply Refer to the installa tion plan page 45 The xed...

Страница 32: ...odour Refer to the safety data sheet HEALTH SAFETY DATA SHEET Use Keep cleaning products out of the reach of children and unauthorised persons Do not swallow Do not mix cleaning products with other ch...

Страница 33: ...hem in a location separate from acids Do not store them together with food alcohol or tobacco Comply with all local and legal regulations regarding the storage of chemicals cleaning prod ucts Serial p...

Страница 34: ...ered in recyclable cartons and pallets Coffee grounds Coffee grounds can be strewn on your garden or added to a compost system Maintenance parts Parts which are exchanged during a service are reproces...

Страница 35: ...Appendix www schaerer com 68 BASI 2 EN Version 04 08 2007...

Отзывы: