27
4.3 Installation
1.
Always
Keep proper footing & balance while moving this
208 kgs machine. And only use heavy-duty fibre belt to lift
the machine as per Fig. (B).
2.
Hang the machine up, away from the floor, take away the
4 pads and assemble them on the auxiliary stand. Fix the
machine on the auxiliary stand and lock the connection
nut.
7.
Finish
removing this wooden case/crate from the
machine. Unbolt the machine from the crate bottom.
8.
Positio
n & tighten 4 bolts into base holes properly after
machine in balance.
9.
Turn off
the power before wiring & be sure machine is in
proper grounding. Overload & circuit breaker is
recommended for safety wiring.
10.
Keep
machine always out from sun, dust, wet, raining area.
4.4 Cleaning and lubricating
1.
Your machine has been coated with a heavy grease to protect it in shipping. This
coating should be completely removed before operating the machine. Commercial
degreaser, kerosene or similar solvent may be used to remove the grease from
the machine, but avoid getting solvent on belts or other rubber pars.
2.
After cleaning, coat all bright work with a light lubricate all points, with a medium
consistency machine oil.
5. MINIMUM ROOM SPACE FOR MACHINE OPERATION
Содержание Blackbolt 220 GSHT
Страница 1: ...MADE BY SCANTOOL GROUP Manual BLACKBOLT Metalbåndsav Metal Cutting Bandsaw 220 GSHT ...
Страница 39: ...39 12 KREDSLØBSDIAGRAM WIRING DIAGRAM ...
Страница 40: ...40 13 TEGNING OVER RESERVEDELE DRAWINGS OF SPARE PARTS ...
Страница 41: ...41 ...
Страница 42: ...42 ...
Страница 43: ...43 ...
Страница 44: ...44 ...
Страница 45: ...45 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...48 ...