
Manufacturer :
SBM
3 cottages de la Norge 21490 CLENAY - FRANCE
http ://www.sbm-international.net
1312
Agent :
Installer's stamp :
GAS INFRARED HEATERS
RI 6 / 8 / 10 / 12 / 16 HEATERS
USER GUIDE
Nr. 05000309/5
( TO BE DISPLAYED NEXT TO THE CONTROL UNIT )
M A N U A L O P E R A T I O N
START-UP :
Open the main gas valve.
Switch the power on.
Start the heater ignition cycle.
If the flame is not lit after 30 seconds, the heater goes to safety state.
The sequence of ignition can begin again only after switching the power off.
After 5 seconds, switch the power on.
The heater is on as long as : power supply is on and the valves are opened.
If the flame is still not lit or goes out, close the main gas valve, switch
the power off and call your SBM installer.
SHUT OFF :
Close the main gas valve.
Switch the power off.
MAINTENANCE :
To be performed
once a year
by your SBM installer, according to the
SBM INSTALLER INSTRUCTIONS Nr. 05000310.
Содержание RI 6
Страница 6: ...TO BE DISPLAYED NEXT TO THE CONTROL UNIT...