background image

 

3.2.

 

Projection  kit  assembly  (4"  projection 
shown) 

-

 

Secure  the  side  projection 

(G)

  to  the  top 

projection 

(H)

 by the means of two bolts 

(K)

 

and  two  nuts 

(L)

.  Repeat  this  procedure  for 

the assembly on the other side 

(J)

.

  

 

3.3.

 

Projection kit installation 

-

 

Align  the  holes  inside  the  projection  kit 
assembly  with  the  corresponding  holes  on 
the faceplate backing plate and fasten with 6 
screws 

(B)

 

 

Step 4 : Cast iron faceplate installation 

 

Finalize the positioning of the wood insert so 
that  the  faceplate  backing  plate  leans 
against  the  fireplace’s  front  finish.    Then 
refer  to  the  manual  supplied  with  your 
heater  to  install  the  cast  iron  components 

(M)

  using  screws 

(N)

  pre-installed  on  the 

front of the firebox of the insert. 

 

Содержание AC01323

Страница 1: ...he projection of the cast iron faceplate to the front of the fireplace opening This will determine its location on the convection air jacket of the insert If the projection is greater than 0 a projection kit AC01323 will need to be used before the installation of the cast iron faceplate See step 3 Note that in order to install the optional projection kit AC01323 one of the optional faceplate backi...

Страница 2: ...nvection air jacket D with screws B The location of the predrilled holes in the convection air jacket are to identify the following projections 1 The cast iron faceplate has no projection 0 from the front of the fireplace finish 2 The cast iron faceplate has a 2 projection from the front of the fireplace finish 3 The cast iron faceplate has a 4 projection from the front of the fireplace finish To ...

Страница 3: ...lign the holes in the panel F with the inner holes of the brackets C and secure with two screws B Note If your installation requires the addition of a projection kit AC01323 go to step 3 Otherwise go to step 4 Step 3 Projection kit installation AC01323 2 or 4 For a 4 projection go directly to step 3 2 3 1 For a 2 projection Fold each part G H and J on the axis of the micro joints to separate them ...

Страница 4: ...oles inside the projection kit assembly with the corresponding holes on the faceplate backing plate and fasten with 6 screws B Step 4 Cast iron faceplate installation Finalize the positioning of the wood insert so that the faceplate backing plate leans against the fireplace s front finish Then refer to the manual supplied with your heater to install the cast iron components M using screws N pre in...

Отзывы: