RT-2AR Operator Manual
2
BEFORE INSTALLATION
NOTE: Upon receipt of this unit, immediately unpack and inspect for possible concealed shipping damage. If unit
is found to be damaged, save all packing materials and contact your delivery carrier within 5 days. Refer to
“Shipping Damage Instructions” enclosed for detailed instructions. Failure to follow these instructions will negate
Savory’s or your ability to file claims and receive compensation for shipping damage.
This manual contains important safety and installation-operation instructions. Require all operators to read this
manual before using the unit. Failure to follow the instructions contained in this manual may cause injury, damage
to the unit, and will void the warranty.
The RT-2AR should be placed in the most convenient location for ease of cleaning, maintenance, service and
general operation. Careful consideration should be given to avoid drafts, close proximity to grease or vapor-
producing appliances or other high ambient heat equipment.
A minimum of ½” clearance is required for air circulation. This is assured by the rounded “acorn” nuts protruding
from the sides and rear of the unit. Overhead clearance from the top of the toaster should be as much as possible
and sufficient to allow heat dissipation.
INSTALLATION
The toaster must be level for proper operation and comes equipped with adjustable legs for this purpose. The
receiving tray and delivery chute can now be installed (Figure A). Locate the four protruding pins inside the bottom
front opening of the toaster. The two lower pins lock the receiving tray into position. The two upper pins support
the delivery chute on one end. The other end of the chute rests on the lower pins so it lies at an angle from the
conveyor to the receiving tray. The receiving tray is installed first. Tilt the tray so that the back end slides along the
bottom of opening and passes under and behind the two lower pins (Figure B). With tray resting flatly on bottom of
opening, gently pull toward you until the back wall of tray is stopped by the pins (Figure C). The delivery chute is
now installed through the same opening. The notches in the sides must be with the open side down (Figure A).
Slide chute over the upper pins until they rest in notches then lower chute so opposite end rests on the lower pins
(Figure D).
Rear Delivery: Install toast receiving tray through
lower front opening and slide through until the one high
side wall rests against the two lower pins (Figure E).
The toast delivery chute is now installed through the
rear opening and brought up at an angle with the
curved end down. The notches closest to the upper
(flat) end on the chute rest over the upper pins. The
lower curved end of the chute rests in the receiving
tray (Figure F).
To convert to front delivery, remove receiving tray and
reinstall as shown in Figure A. Delivery chute is
inserted with curved end up and flat end resting in
receiving tray (Figure D).