4.
Drill the row of holes on the front side. (we recommend a distance of
64 mm,
every second tine
)
This process is repeated on all front sides of the construction
shelves.
It is important that the stop sides are always the same at the end
drillings. For the surface drillings you must then use the
corresponding opposite stop side. (e.g. if stop end face left = stop
face right)