Chapter 2 Installation
15
N
K
-
+
L
K
+
-
L
K
+
-
L
I
-
-
I
-
-
I
-
-
I
-
-
+
-
1
2
3
4
+
-
+
-
+
-
CT
02-04016
PT
+ -
+ -
+
-
+ -
MEASUREMENT
4N
INPUT VOLTAGE
V
1
V
J9
1
V
3
V
2
3
2
V
V
N
4
5
4
6
SW1
9
6
JDR1
COM1
RS-232
5
1
1
RS-422/485
IRIG-B
J7
4
-Tx
J3
2
+Rx
1
+Tx
3
3
2
5
-Rx
4
5
6
12V GND
-
+
RDM
SUPPLY
MAIN POWER
GROUND
MEASURE
VDC
BACKUP
POWER SUPPLIES
MAIN
-
+
N/-
2
125/220V DC
J10
DC
+
1
N/-
L/+
-
SW2
3
4
L/+
5
6
OR 120/230V AC
125/220V DC
NOT CONNECTED
8
1
RS-485
ETHERNET
RS-422/485
MODEM
JP3
1
4
J1
COM2
7
8
+Rx
+Tx
1 2
4
-Rx
3
-Tx
5
1
J2
COM3
3
P.SUPPLY
4
RDM
5
3 2
4
USB
J11
2
3
2
4
1
6
5
7
Switches
Shorting
1
J5
8
LINE 1
LINE 3
LINE 2 (B)
(C)
(A)
LOAD
CURRENT
INPUTS:
SA320 150A
SA310 150A
J14
J12
Figure 2-7
SA310, SA320:
Four Wire Wye Connection Using 2 PTs, 3 CTs (2
½
-element)
Wiring Mode =
3LL3
or
3Ln3